ETA Systems SM5505 manual General

Page 6

Section 1 - General

This manual describes the installation, connection, adjustment and operation of electrically powered equipment. For your convenience, this document has been divided into the following nine sections.

Section 1 - General: The section which your are currently reading describes the manual’s structure and the location of pertinent information required to install, operate, troubleshoot, repair, and maintain the product.

Section 2 - Safety: This section provides information on the safe installation and use of the product.

Section 3 - Product Overview: This section describes the product’s function and purpose, gives examples of some applications where it may be used, and describes the both standard and optional product features. It also gives details on unpacking and inspecting the product on arrival and preparing it for installation.

Section 4 - Preparation: This section provides information on unpacking and moving the conditioner.

Section 5 - Installation: This section provides details on locating and leveling the product, landing conduits, grounding, connecting input and output wiring, configuring operating voltages, and preparing the unit prior to energizing and putting into service.

Section 6 - Operation: This section of the manual provides the information required to operate the product and its controls.

Section 7 - Optional Equipment: This section gives detailed information on features which are available as options. Your particular product may be equipped with one or more options. If so, this section will provide the information necessary to use the options.

Section 8 - Troubleshooting and Maintenance: This section provides all the information necessary to maintain the product, troubleshoot a failure or malfunction, and to repair the product when possible.

Section 9 - Service and Support: This section provides the information necessary to obtain service and support on the product.

Section 10 - Technical Specifications: This section provides complete technical specifications. Consult the information in this section for detailed information on conduit landings and electrical parameters for the specific model you are installing.

As you use this manual for the installation, operation, and maintenance of the product, you may be required to consult different sections of this manual in the process of completing specific tasks.

6

Conditioned Power Center

Image 6
Contents CPC Series Conditioned Power Center Table of Contents Service and Support E a S E General Inherent Hazards SafetyAnsi Warning Notices Alerts and LabelsLine Voltage Present With Machine Power OFF Wear protective gear before servicing internal partsSafety Interlocks Lockout/TagoutConformance with Applicable Laws and Regulations Product LiabilityEmergency Contact Information Product Overview Product PurposeStandard Features Optional FeaturesFeature Preparation UnpackagingPreparation Figure D Shipping Crate Disassembly 10 to 20 kVA Installation Main Input Circuit Breaker Outer Panel RemovalAlternate Conduit Landing Locations Fixed Input Circuit BreakersIsolation Transformer Programmable Circuit BreakersTransformer Primary Voltage Adjustment Figure GOutput Voltage Fine Adjustment GroundingLockout/Tagout Procedure Figure JInput Power Connections Output Power ConnectionsModels With Optional Line Cord/Output Receptacles Restoring For Service Energizing the Power ConditionerOperation Energizing the Load Orderly ShutdownConditioned Power Center External EMO Phase Loss/Low Voltage Detection and ProtectionOptions Seismic AnchorageInput Power Conductor Restraints Semi S2-0200 CertificationSemi S2-0200 Compliant EMO Options Source Circuit Breaker Trip Troubleshooting/MaintenanceConditions Requiring Troubleshooting Input Circuit Breaker TripsTvss Fault LEDs Illuminate Routine Maintenance Harmonic Filter Circuit Breaker Trips OutService and Support Technical and Service Assistance Customer ServiceProduct Warranty Specifications CPC Series SchematicGPI Series 2000 Standard EMO GPI Series 2000 Semi S2 EMO Output Voltage Fine Adjustment Important ALL Work to be Done By a Licensed ElectricianDocument Revision History Title Rev. Letter Rel. Date Next Rev. LevelSM5505- Rev. a 03/01/2006, 2006 ETA Systems39