2-1. Selection of tested device
Start the standard test | Do not test |
Please begin testing clicking if the selection of the tested device ends.
2-2. "PC-Diagnostic utility" End method
When of "Close" on the right of the screen is clicked, the computer reactivates automatically. Or, the power supply switch is done in the slide and the power supply is turned off.
2-3. The content of the setup is returned to the setting of the user
1.Turned on the computer.
2."F2" is pushed on the screen while "Press<F2>to enter Setup" is displayed of "Panasonic".
3.Push "F10", and on the screen of "Is the change in the setting preserved and do end?"and then "Yes" is selected, and "Enter" is pushed.
4.The computer reactivates automatically.
5.The end option is chosen by the start menu, and the power supply of the computer is turned off.
Standard at test time |
|
All devices other than RAM and HDD | about 1 minute |
RAM standard test | 1 - 2 minutes |
HDD standard test | 2 - 3 minutes |
HDD enhancing test (60GB) | about 40 minutes |
Ex.The standard when the standard <all device> is tested becomes 1+2+3=6 minutes.
■There is greatly a difference from RAM test when the memory is increased according to the performance of the memory occasionally.
■Moreover, when the main body of PC under the test is a high temperature, it occasionally takes time.