Nortel Networks 8010co manual Accessing the alarm module, Opening the front panel

Page 30

30Chapter 1 Overview

Accessing the alarm module

Danger: Ensure that the DC power source is off or disconnected at the remote end before you perform any of the steps in this section. Be sure that the DC input source power is locked out and tagged.

The alarm module contains jumpers that you can configure to allow the BIP to monitor the shelf alarm cables for a single or dual chassis installation. The BIP ships from the factory with default jumper configurations set for a single chassis in the lower shelf of the rack. If you install a second chassis in the upper shelf, you must configure the jumpers on the alarm module to support that configuration.

Note: The jumper configuration has no affect on the chassis status alarms.

The BIP front panel opens to provide access to the jumpers on the alarm module.

To open the front panel:

1Using a Phillips screwdriver, loosen the two front panel locking screws (Figure 11).

Figure 11 Opening the front panel

1

POWE

R

CRITIC

AL

MAJOR

MINOR

1 = Front panel locking screws (x 2)

10375FB

312755-G Rev 00

Image 30
Contents Part No -G Rev May Great America Parkway Santa Clara, CA Statement of conditions Copyright 2006 Nortel Networks. All Rights ReservedTrademarks International regulatory statements of conformityCE marking statement Europe only Vcci statement Japan/Nippon onlyNortel Inc. software license agreement EN 60 950 statementGeneral Rev Contents Contents RevIndex Contents Rev Figures Rack grounding strip example Tables Tables Rev Preface Before you beginGetting Help from the Nortel Web site How to get HelpText conventions PrefaceGetting Help over the phone from a Nortel Solutions Center Getting Help through a Nortel distributor or resellerPreface Rev Chapter Overview Physical descriptionFront panel Shelf circuit breakers upper and lower shelvesOverview Shelf circuit breakers Alarm module display panel Alarm module display LEDsMajor Shelf alarm connectors upper and lower shelves Back panelFront panel locking screws Shelf alarm connections upper and lower shelves Central office alarms Configuring multiple BIPs to aggregate office alarmsPower terminal block Configuring standalone BIPs to report alarm status1 3 2 1 3 2 1 a 1 a 2 B 1 B Power and grounding example Accessing the alarm module Opening the front panelAccessing the alarm module Configuration example 8010co chassis configuration with BIP optionChapter Installation Preparing to install the breaker interface panelShipment contents Mounting hardware DC power requirementsAdditional equipment DC input electrical requirementsInstalling the breaker interface panel Installing the hardwareRemoving the plastic back cover from the BIP Connecting cables to the chassis power supplies Removing the 8010co chassis bottom 312096-A bezel Location of power supplies Loosening the power supply retaining screws +DC -DC Power supply cables Attaching the positive lead +DC -DC Replacing the power supply Routing power supply cables to the BIP Labeling cables for the BIPConnecting the ground cables to the rack grounding strip Rack grounding strip exampleConnecting the power supply cables to the BIP Attaching power supply cable leads to the BIPLocate the BIP ground cable see on Attaching the BIP ground cable Connecting DC input power feeds to the BIP B feed example Single chassis and dual chassis input optionsLocating the a and B -48 VDC input feeds Connecting the a and B -48 VDC input feeds to the BIP 1 Connecting the a and B -48 VDC input feeds to the BIP 2 Connecting the A/B input feed returns 1 Go to the next section, Replacing covers on Replacing covers Replacing the plastic back cover on the BIPGo to the next section, Installing shelf alarm cables on Installing shelf alarm cables Installing shelf alarm cablesVerifying the installation Initial power-up Verifying the LEDsPowering off the system Installation Installation Rev Chapter Problem solving Problem solving Interpreting the LEDsOr a problem in circuits that are not essential to Diagnosing and correcting the problem Corrective actions Corrective actionsProblem solving Corrective actions Appendix a Technical specifications EnvironmentalAppendix a Technical specifications Physical dimensionsSafety agency certification ElectricalShelf alarm connectors J1 and J2 Appendix B BIP external cable pin assignmentsJ1 and J2 shelf alarm connector pin assignments Appendix B BIP external cable pin assignmentsOffice alarm connectors J3 and J4 J3 and J4 high-density 26-pin D-sub connectorJ3 and J4 office alarm connector pin assignments Standalone office alarm connector J5 J5 high-density 26-pin D-sub connectorJ5 standalone office alarm connector pin assignments Index NumbersIndex