ATEN Technology PN9108U user manual Daisy Chaining

Page 28

PN9108U User Manual

Daisy Chaining

To manage even more devices, up to 15 additional PN9108U Stations can be daisy chained down from the top level unit. In this way, up to 128 devices can be managed on a complete installation. To set up a daisy chained installation do the following:

1.For each PN9108U Station that you add to the chain, use the DB-9 to DB-9 PON cable that was provided with it to connect the parent PN9108U’s PON OUT port to the child PN9108U’s PON IN port.

2.Power up the daisy chained PN9108U Stations in sequence starting with the highest level Station and working down. In each case, wait for the PN9108U’s Station ID to be ascertained and displayed on the Station ID LED before powering on the next unit.

The Station ID for First Stage (top level) unit is 01; the ID for the Second Stage unit is 02, etc.

3. After all the PN9108U Stations are up, power on the devices.

14

2005-09-07

Image 28
Contents PN9108U Regulatory Information User Notice Safety Instructions General2005-09-07 Rack Mounting Power Cord Power CordsPower Outlet Cords Package Contents Contents Administration Safe Shutdown and RebootUpgrading The Firmware AppendixAbout This Manual OverviewGetting Help ConventionsAltusen Information Technical SupportProduct Information Altusen Authorized ResellersXiv Introduction OverviewFeatures Optional Capability Requirements Hardware Setup Front ViewPower LED Rear View RS-232 PortPower Switch Before you Begin InstallationStacking Phillips hex head M3 x Hardware Setup Single Stage Installation Hardware Setup Daisy Chaining Browser Operation LoggingPN9108U Main Screen Device Selector Device ControlPower Buttons Power Status ScreenTop Panel Reboot Information PanelBottom Panel Administration Working Environment ConfigurationSystem Information AdministratorConnection Control Network Fixed IP AddressDynamic IP Address Date / Time Firmware LogoutPower Management Configuration ConfigurationHeading Meaning This function disables the Reboot checkbox on the main Outlet Groups UPSPN9108U Schedule User Management Monitor Log 2005-09-07 Safe Shutdown and Reboot Automated Setup InstallationUninstalling Manual Setup Windows 2000 / XP / ServerSafe Shutdown and Reboot 2005-09-07 Upgrading The Firmware PreparationStarting the Upgrade IP Address Determination MethodMethod Arp -s ip address PN9108U’s MAC address Problem TroubleshootingSolution Problem Problem Administrator Login Failure Specifications Function SpecificationBattery Replacement Limited Warranty Index 2005-09-07