American Power Conversion PD60G6FK1, PD60F6FK1, PD60L6FK1, PDRPPNX10 manual Emi

Page 12

Safety

EMI

This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with this user manual, may cause harmful interference to radio communications. Operation of this equipment in a residential area is likely to cause harmful interference. The user will bear sole responsibility for correcting such interference.

This Class A digital apparatus complies with Canadian ICES-003.

Cet appareil numérique de la classe A est conforme à la norme NMB-003 du Canada.

4

60 kW InfraStruXure PDU — Operation and Configuration

Image 12
Contents 60kW InfraStruXure PDU Page How to find updates to this manual About This ManualAudience Companion manualsPage Contents Operation Specifications Product Information Safety Safety symbols used in this manualCross-reference symbols used in this manual OverviewInstallation/Maintenance Receiving/movingInput Voltage Circuit Breaker Sizing Total power off procedure Emergency Power Off EPOEMI Overview InfraStruXure PDUFront view Front view interior Rear view of PDU with transformer interior PDURear view of PDU without transformer interior PDU monitoring unit User connection plate Multi-Branch Cordset Adapters SKU #Compatible APC 208V PDUs PDU Display Interface       Top-level status screens Top-level menu screenNavigating through screens Password-protected screens Power Factor Load-Meter ScreenVolt-Meter Screen Contacts Screen OverviewInput Contacts Open or ClosedAlarm Relay Map Relay output. For example, AlarmHow to connect contacts to the PDU monitoring unit Breakers Screen Main InputAlarms Screen New Logged ItemsEntire Log Clear LogGlobal Alarm ConfigLoading Limits Voltage LimitsPDU Alarms Alarm Condition ExplanationPanel Screen Branch Ckt LoadingBranch Ckt Limits Panel Configuration Circuit breakers occupying positions 08, 10, and 12 onTop right distribution panel Global Panel Config Config Screen System PasswordSystem/Network Date/TimeElectrical Config Input ConfigOutput Config Manufacturer DataFactory Defaults Firmware UpdatesHow to Apply Power to the System OperationFor PDUs with and without a transformer How to Ensure Total Power Off For PDU with transformer Open turnPage Communication Configuration InfraStruXure PDU Management OptionsInfraStruXure Manager Network management interfacesConfiguring the InfraStruXure Manager Connect the InfraStruXure PDU to the InfraStruXure ManagerConfiguring the Network Management Interface Configuration OverviewConnect the InfraStruXure PDU to your network TCP/IP configuration methods Device IP Configuration WizardBootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where Local access to the control console Use apc for the User Name and PasswordRemote access to the control console Use apc for both User Name and Password Control consoleChoose Network from the Control Console menu Quick-Start manual for access information Web interfaceSnmp FTP and SCP KW InfraStruXure PDU-Operation and Configuration Important Safety Instructions Customizing and Updating the PDUPower Cables PDU Orderable Part ListCircuit Breakers Customizing and Updating the PDU How to Add Circuit Breakers and Power Cables Add a power cable to the PDUAdd a circuit breaker on the PDU Customizing and Updating the PDU ATS 0 ATS 1 ATS Atsen How to connect contacts to the PDU monitoring unit How to Test the EPO Switch To test your EPO wiring and switchesSafety warnings Customizing and Updating the PDU How to Download Firmware Upgrades Upgrading the PDU monitor processorFrom a local computer Xmodem Specifications 60kW InfraStruXure PDUCompliance InfraStruXure Standard Warranty Product InformationProduct Information APC Three-Phase Systems Life-Support PolicyHow to Obtain Service How to contact APCAppendix Changes in This Manual General changesChanges by page number Page Index 60kW InfraStruXure PDU-Operation and Configuration Page Page Page APC Worldwide Customer Support