American Power Conversion PD60G6FK1, PD60F6FK1 manual Rear view of PDU without transformer interior

Page 16

Overview

Rear view of PDU without transformer (interior)

!

The Main Input circuit breaker connects to the main power source (UPS or utility). The breaker accepts 208V input and requires 4-wire input conductors.

Note: This circuit breaker also serves as the Main Output (disconnect)

circuit breaker.

The PDU monitoring unit has several current and voltage monitoring boards that report to a central board assembly located in the PDU monitoring unit. The PDU monitoring unit has one 10Base-T (Cat-5) connection to the Information Controller hub (or switch), four relay output connections, four input contact connections, and one EPO input connection. Make these connections at the user connection plate located on the roof of the PDU.

8

60 kW InfraStruXure PDU—Operation and Configuration

Image 16
Contents 60kW InfraStruXure PDU Page How to find updates to this manual About This ManualAudience Companion manualsPage Contents Operation Specifications Product Information Safety Safety symbols used in this manualCross-reference symbols used in this manual OverviewReceiving/moving Installation/MaintenanceInput Voltage Circuit Breaker Sizing Total power off procedure Emergency Power Off EPOEMI InfraStruXure PDU OverviewFront view Front view interior Rear view of PDU with transformer interior PDURear view of PDU without transformer interior PDU monitoring unit User connection plate Multi-Branch Cordset Adapters SKU #Compatible APC 208V PDUs PDU Display Interface       Top-level menu screen Top-level status screensNavigating through screens Password-protected screens Power Factor Load-Meter ScreenVolt-Meter Screen Contacts Screen OverviewInput Contacts Open or ClosedAlarm Relay Map Relay output. For example, AlarmHow to connect contacts to the PDU monitoring unit Breakers Screen Main InputAlarms Screen New Logged ItemsEntire Log Clear LogGlobal Alarm ConfigLoading Limits Voltage LimitsPDU Alarms Alarm Condition ExplanationBranch Ckt Loading Panel ScreenBranch Ckt Limits Circuit breakers occupying positions 08, 10, and 12 on Panel ConfigurationTop right distribution panel Global Panel Config Config Screen System PasswordSystem/Network Date/TimeElectrical Config Input ConfigOutput Config Manufacturer DataFactory Defaults Firmware UpdatesHow to Apply Power to the System OperationFor PDUs with and without a transformer How to Ensure Total Power Off For PDU with transformer Open turnPage Communication Configuration InfraStruXure PDU Management OptionsInfraStruXure Manager Network management interfacesConfiguring the InfraStruXure Manager Connect the InfraStruXure PDU to the InfraStruXure ManagerConfiguration Overview Configuring the Network Management InterfaceConnect the InfraStruXure PDU to your network TCP/IP configuration methods Device IP Configuration WizardBootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where Use apc for the User Name and Password Local access to the control consoleRemote access to the control console Control console Use apc for both User Name and PasswordChoose Network from the Control Console menu Quick-Start manual for access information Web interfaceSnmp FTP and SCP KW InfraStruXure PDU-Operation and Configuration Important Safety Instructions Customizing and Updating the PDUPDU Orderable Part List Power CablesCircuit Breakers Customizing and Updating the PDU Add a power cable to the PDU How to Add Circuit Breakers and Power CablesAdd a circuit breaker on the PDU Customizing and Updating the PDU ATS 0 ATS 1 ATS Atsen How to connect contacts to the PDU monitoring unit How to Test the EPO Switch To test your EPO wiring and switchesSafety warnings Customizing and Updating the PDU Upgrading the PDU monitor processor How to Download Firmware UpgradesFrom a local computer Xmodem Specifications 60kW InfraStruXure PDUCompliance InfraStruXure Standard Warranty Product InformationProduct Information APC Three-Phase Systems Life-Support PolicyHow to Obtain Service How to contact APCGeneral changes Appendix Changes in This ManualChanges by page number Page Index 60kW InfraStruXure PDU-Operation and Configuration Page Page Page APC Worldwide Customer Support