American Power Conversion PD60F6FK1 Electrical Config, Input Config, Output Config, System ID

Page 37

PDU Display Interface

Electrical Config

This option of the Config screen displays information about the electrical service that provides input to the PDU. All of the values displayed on this screen are set at the factory. Use this information when viewing and setting alarms.

Input Config

Configure the following items:

 

Main Input: The voltage from the power source coming into

 

 

the PDU main input switch.

 

 

• 3W: 3-phase Delta, measured line-to-line

 

 

• 4W: 3-phase wye, measured line-to-neutral

 

Transformer: Indicates whether the PDU has a transformer.

Output Config

Configure the following items:

 

Panel Voltage: The nominal voltage of the distribution panels

 

 

supplying power to the load equipment. (This is measured

 

 

line-to-neutral.)

 

Panel Breaker: The rating, in amps, of the circuit breaker

 

 

feeding the distribution panels.

Manufacturer Data

Use this option of the Config screen to display a scrollable list containing information about the PDU. This information is useful when requesting service or product updates. The following information is displayed:

Manufacturer Name

Date of Manufacture

Date of Calibration

Hardware Revision

Firmware Revision (for PDU monitoring and metering)

Serial Number

Model Number

System ID

Use this option of the Config screen to identify your PDU. The following fields can be configured:

Device Name Set a unique name for your PDU.

Product Location Name the physical location of the product in your data center.

Product Contact Identify the person to notify concerning questions or problems with regard to the product.

60 kW InfraStruXure PDU — Operation and Configuration

29

Image 37
Contents 60kW InfraStruXure PDU Page About This Manual How to find updates to this manualAudience Companion manualsPage Contents Operation Specifications Product Information Safety symbols used in this manual SafetyCross-reference symbols used in this manual OverviewReceiving/moving Installation/MaintenanceInput Voltage Circuit Breaker Sizing Emergency Power Off EPO Total power off procedureEMI InfraStruXure PDU OverviewFront view Front view interior PDU Rear view of PDU with transformer interiorRear view of PDU without transformer interior PDU monitoring unit User connection plate SKU # Multi-Branch Cordset AdaptersCompatible APC 208V PDUs        PDU Display InterfaceTop-level menu screen Top-level status screensNavigating through screens Password-protected screens Load-Meter Screen Power FactorVolt-Meter Screen Overview Contacts ScreenInput Contacts Open or ClosedRelay output. For example, Alarm Alarm Relay MapHow to connect contacts to the PDU monitoring unit Main Input Breakers ScreenNew Logged Items Alarms ScreenEntire Log Clear LogConfig Global AlarmLoading Limits Voltage LimitsAlarm Condition Explanation PDU AlarmsBranch Ckt Loading Panel ScreenBranch Ckt Limits Circuit breakers occupying positions 08, 10, and 12 on Panel ConfigurationTop right distribution panel Global Panel Config System Password Config ScreenSystem/Network Date/TimeInput Config Electrical ConfigOutput Config Manufacturer DataFirmware Updates Factory DefaultsOperation How to Apply Power to the SystemFor PDUs with and without a transformer For PDU with transformer Open turn How to Ensure Total Power OffPage InfraStruXure PDU Management Options Communication ConfigurationInfraStruXure Manager Network management interfacesConnect the InfraStruXure PDU to the InfraStruXure Manager Configuring the InfraStruXure ManagerConfiguration Overview Configuring the Network Management InterfaceConnect the InfraStruXure PDU to your network Device IP Configuration Wizard TCP/IP configuration methodsBootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where Use apc for the User Name and Password Local access to the control consoleRemote access to the control console Control console Use apc for both User Name and PasswordChoose Network from the Control Console menu Web interface Quick-Start manual for access informationSnmp FTP and SCP KW InfraStruXure PDU-Operation and Configuration Customizing and Updating the PDU Important Safety InstructionsPDU Orderable Part List Power CablesCircuit Breakers Customizing and Updating the PDU Add a power cable to the PDU How to Add Circuit Breakers and Power CablesAdd a circuit breaker on the PDU Customizing and Updating the PDU ATS 0 ATS 1 ATS Atsen How to connect contacts to the PDU monitoring unit To test your EPO wiring and switches How to Test the EPO SwitchSafety warnings Customizing and Updating the PDU Upgrading the PDU monitor processor How to Download Firmware UpgradesFrom a local computer Xmodem 60kW InfraStruXure PDU SpecificationsCompliance Product Information InfraStruXure Standard WarrantyProduct Information Life-Support Policy APC Three-Phase SystemsHow to contact APC How to Obtain ServiceGeneral changes Appendix Changes in This ManualChanges by page number Page Index 60kW InfraStruXure PDU-Operation and Configuration Page Page Page APC Worldwide Customer Support