American Power Conversion PD60F6FK1, PD60G6FK1, PD60L6FK1, PDRPPNX10 manual Volt-Meter Screen

Page 25

Volt-Meter Screen

From the Volt-Meterscreen, you can select the following items:

Output Voltage Displays each phase-to-phase output voltage (e.g., L1-2for phase L1 to phase L2) and each phase-to-neutral output voltage (e.g., L1 for phase L1 to neutral).

Input Voltage Displays each phase-to-phase input voltage (e.g., L1-2for phase L1 to L2), or, if your service transformer is a wye transformer, each phase-to-neutral input voltage (e.g., L1 for phase L1 to neutral).

60 kW InfraStruXure PDU — Operation and Configuration

17

Image 25
Contents 60kW InfraStruXure PDU Page About This Manual How to find updates to this manualAudience Companion manualsPage Contents Operation Specifications Product Information Safety symbols used in this manual SafetyCross-reference symbols used in this manual OverviewReceiving/moving Installation/MaintenanceInput Voltage Circuit Breaker Sizing Emergency Power Off EPO Total power off procedureEMI InfraStruXure PDU OverviewFront view Front view interior PDU Rear view of PDU with transformer interiorRear view of PDU without transformer interior PDU monitoring unit User connection plate SKU # Multi-Branch Cordset AdaptersCompatible APC 208V PDUs        PDU Display InterfaceTop-level menu screen Top-level status screensNavigating through screens Password-protected screens Load-Meter Screen Power FactorVolt-Meter Screen Overview Contacts ScreenInput Contacts Open or ClosedRelay output. For example, Alarm Alarm Relay MapHow to connect contacts to the PDU monitoring unit Main Input Breakers ScreenNew Logged Items Alarms ScreenEntire Log Clear LogConfig Global AlarmLoading Limits Voltage LimitsAlarm Condition Explanation PDU AlarmsBranch Ckt Loading Panel ScreenBranch Ckt Limits Circuit breakers occupying positions 08, 10, and 12 on Panel ConfigurationTop right distribution panel Global Panel Config System Password Config ScreenSystem/Network Date/TimeInput Config Electrical ConfigOutput Config Manufacturer DataFirmware Updates Factory DefaultsOperation How to Apply Power to the SystemFor PDUs with and without a transformer For PDU with transformer Open turn How to Ensure Total Power OffPage InfraStruXure PDU Management Options Communication ConfigurationInfraStruXure Manager Network management interfacesConnect the InfraStruXure PDU to the InfraStruXure Manager Configuring the InfraStruXure ManagerConfiguration Overview Configuring the Network Management InterfaceConnect the InfraStruXure PDU to your network Device IP Configuration Wizard TCP/IP configuration methodsBootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where Use apc for the User Name and Password Local access to the control consoleRemote access to the control console Control console Use apc for both User Name and PasswordChoose Network from the Control Console menu Web interface Quick-Start manual for access informationSnmp FTP and SCP KW InfraStruXure PDU-Operation and Configuration Customizing and Updating the PDU Important Safety InstructionsPDU Orderable Part List Power CablesCircuit Breakers Customizing and Updating the PDU Add a power cable to the PDU How to Add Circuit Breakers and Power CablesAdd a circuit breaker on the PDU Customizing and Updating the PDU ATS 0 ATS 1 ATS Atsen How to connect contacts to the PDU monitoring unit To test your EPO wiring and switches How to Test the EPO SwitchSafety warnings Customizing and Updating the PDU Upgrading the PDU monitor processor How to Download Firmware UpgradesFrom a local computer Xmodem 60kW InfraStruXure PDU SpecificationsCompliance Product Information InfraStruXure Standard WarrantyProduct Information Life-Support Policy APC Three-Phase SystemsHow to contact APC How to Obtain ServiceGeneral changes Appendix Changes in This ManualChanges by page number Page Index 60kW InfraStruXure PDU-Operation and Configuration Page Page Page APC Worldwide Customer Support