American Power Conversion PDRPPNX10, PD60G6FK1, PD60F6FK1 manual Customizing and Updating the PDU

Page 55

Customizing and Updating the PDU

Important Safety Instructions

Electrical Hazard

APC does not recommend that you perform maintenance of the PDU while it is receiving input power. However, due to the critical nature of data center loads, this may occur. If you must perform maintenance while the PDU is receiving input power, observe the following precautions to reduce the risk of electric shock:

1.Never work alone.

2.Perform the maintenance only if you are a certified electrician who is trained in the hazards of live electrical installation.

3.Know the procedure for disconnecting electricity to the PDU and the data center in case of an emergency.

4.Wear appropriate personal protective equipment.

5.Use double-insulated tools.

6.Always follow local and site regulations when working on the PDU.

60 kW InfraStruXure PDU — Operation and Configuration

47

Image 55
Contents 60kW InfraStruXure PDU Page Companion manuals How to find updates to this manualAbout This Manual AudiencePage Contents Operation Specifications Product Information Overview SafetySafety symbols used in this manual Cross-reference symbols used in this manualReceiving/moving Installation/MaintenanceInput Voltage Circuit Breaker Sizing Emergency Power Off EPO Total power off procedureEMI InfraStruXure PDU OverviewFront view Front view interior PDU Rear view of PDU with transformer interiorRear view of PDU without transformer interior PDU monitoring unit User connection plate SKU # Multi-Branch Cordset AdaptersCompatible APC 208V PDUs        PDU Display InterfaceTop-level menu screen Top-level status screensNavigating through screens Password-protected screens Load-Meter Screen Power FactorVolt-Meter Screen Open or Closed Contacts ScreenOverview Input ContactsRelay output. For example, Alarm Alarm Relay MapHow to connect contacts to the PDU monitoring unit Main Input Breakers ScreenClear Log Alarms ScreenNew Logged Items Entire LogVoltage Limits Global AlarmConfig Loading LimitsAlarm Condition Explanation PDU AlarmsBranch Ckt Loading Panel ScreenBranch Ckt Limits Circuit breakers occupying positions 08, 10, and 12 on Panel ConfigurationTop right distribution panel Global Panel Config Date/Time Config ScreenSystem Password System/NetworkManufacturer Data Electrical ConfigInput Config Output ConfigFirmware Updates Factory DefaultsOperation How to Apply Power to the SystemFor PDUs with and without a transformer For PDU with transformer Open turn How to Ensure Total Power OffPage Network management interfaces Communication ConfigurationInfraStruXure PDU Management Options InfraStruXure ManagerConnect the InfraStruXure PDU to the InfraStruXure Manager Configuring the InfraStruXure ManagerConfiguration Overview Configuring the Network Management InterfaceConnect the InfraStruXure PDU to your network Device IP Configuration Wizard TCP/IP configuration methodsBootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where Use apc for the User Name and Password Local access to the control consoleRemote access to the control console Control console Use apc for both User Name and PasswordChoose Network from the Control Console menu Web interface Quick-Start manual for access informationSnmp FTP and SCP KW InfraStruXure PDU-Operation and Configuration Customizing and Updating the PDU Important Safety InstructionsPDU Orderable Part List Power CablesCircuit Breakers Customizing and Updating the PDU Add a power cable to the PDU How to Add Circuit Breakers and Power CablesAdd a circuit breaker on the PDU Customizing and Updating the PDU ATS 0 ATS 1 ATS Atsen How to connect contacts to the PDU monitoring unit To test your EPO wiring and switches How to Test the EPO SwitchSafety warnings Customizing and Updating the PDU Upgrading the PDU monitor processor How to Download Firmware UpgradesFrom a local computer Xmodem 60kW InfraStruXure PDU SpecificationsCompliance Product Information InfraStruXure Standard WarrantyProduct Information Life-Support Policy APC Three-Phase SystemsHow to contact APC How to Obtain ServiceGeneral changes Appendix Changes in This ManualChanges by page number Page Index 60kW InfraStruXure PDU-Operation and Configuration Page Page Page APC Worldwide Customer Support