Table of Contents |
|
Safety | 1 |
Handling Safety | 1 |
Electrical Safety | 1 |
Deenergizing Safety | 1 |
Battery Safety | 1 |
Replacement and Recycling of Batteries | 1 |
Initial Inspection | 2 |
Inspection | 2 |
Unpacking | 2 |
Placement | 3 |
Installation Instructions | 3 |
Checking Electrical Data | 3 |
Electrical Connections | 3 |
Mains Connections | 4 |
Rear Views | 5 |
Common Fault | 6 |
Computer Interface Port (Optional) | 6 |
Emergency Power Off (EPO) Remote Shut Down and Signal Relay Port (Optional) | 6 |
Optional Equipment Installation | 8 |
Galvanic Isolation Transformer | 8 |
External Service Bypass Panel (SBP) | 10 |
External Service Bypass Panel and Galvanic Isolation Transformer | 11 |
External Run Battery Cabinet | 12 |
Operating Instructions | 13 |
Switching On | 13 |
Switching Off | 13 |
Setting the Voltage | 13 |
External Service Bypass Panel Operation | 13 |
LEDs | 14 |
Batteries | 15 |
Automatic Battery Check | 15 |
Manual Battery Check | 15 |
Battery Replacement | 15 |
Storage | 15 |
Storage Conditions | 15 |
Extended storage | 15 |
Service | 15 |
Specifications | 16 |
Limited Warranty | 16 |
Regulatory Agency Approvals | 17 |
APC Contact Information | 18 |
Latin America, South America | 18 |
Europe, Middle East, Africa | 18 |
Asia, Australia | 18 |
i |