American Power Conversion SURT15000, 20000 VA Connect load to UPS, Connect power to UPS and load

Page 24

Start-Up

Connect load to UPS

1.The UPS features chassis ground connection screws located on the rear panel, for connecting the ground leads on transient voltage devices.

Prior to connecting the grounding cable, ensure that the UPS is NOT connected to utility or battery power.

2.Connect equipment to the UPS.

NOTE: This UPS is equipped with an external battery connector on the rear panel of the unit.

The battery charges to 90% capacity during the first three hours of normal operation. Do not expect full battery run capability during this initial charge period.

Refer to the APC Web site, www.apc.com for battery runtimes.

Where appropriate use an APC extension battery cable. For ordering details contact your dealer or APC through the Web site www.apc.com.

3.Add optional accessories to the SmartSlot located on the rear panel.

For optimal computer system security, install PowerChute Smart-UPS monitoring software.

Connect power to UPS and load

1.Connect input power to the UPS.

2.Check the PowerView interface display for messages.

3.Turn on the load using the interface display menu options.

Bypass mode

Turn Load On

Communication Ports

SERIAL PORT Use only the supplied cable to connect to the serial port. A standard serial interface cable is incompatible with the UPS.

The serial port can be used to configure tht Network Managegment Card.

20

Smart-UPS RT 15000/20000 VA 230 Vac UXI/UXICH Tower User Manual

Image 24
Contents UXI/UXICH Page Contents Page Unpack package contents About this UPSSpecifications Environmental SpecificationsInstallation Install PowerViewConnect PowerView Route ethernet cable and install top cover and bezelsFront panel access routing ethernet cable under top cover Accessories Optional accessoriesInstall input and output wiring trays in UPS rear panel Wiring Specifications Adhere to national and local electrical codes when wiringInput wiring options Input/Output Jumper ConfigurationsSingle phase input, single phase output, single feed Single phase input, single phase output, dual feedThree phase input, single phase output, single feed Three phase input, three phase output, single feedThree phase input, single phase output, dual feed Three phase input, three phase output, dual feedOutput wiring options L3 L2 L1 OSJBattery Safety APC battery solutionQualified electrician should perform the installation Servicing of external batteriesThird party battery solution Each battery system must have identical Amp-hrsPowerView Interface Display Battery operationOperation Normal operationNavigating menu screens Main Menu ScreenMenu Tree Navigating sub menu screensSub menu screens SystemView Log Connect power to UPS and load Connect load to UPSCommunication Ports Emergency Power Off EPO EPO ConnectorInput/Output Jumper Configurations Page Refer to Contact Information in this Option 2 Correct bypass input Service and Transport Warranty claims Regulatory Agency Approvals Models