GBC 640T operation manual Prior to Installation, To set up the laminator for the first time

Page 11

640t – Installation and Operating Instructions

4.Installation

This chapter describes how to install the machine. There are no operator serviceable parts to the machine other than periodic cleaning. Refer to “7. Operator Maintenance” on page 7-1.

WARNING: Do not attempt to service or repair the laminator. Failure to observe this warning could result in severe personal injury or death.

Disconnect the plug from the receptacle and contact your dealer or distributor when one or more of the following has occurred.

The power supply cord or attachment plug is damaged.

Liquid has been spilled into the laminator.

The laminator is malfunctioning after being mishandled.

The laminator does not operate as described in these instructions.

Prior to Installation

Inspect the package for damage. Shipping damage should be brought to the immediate attention of the delivering carrier.

Installation

To set up the laminator for the first time:

1.Place the laminator on a stable flat surface capable of supporting the weight of the machine. An additional work surface near the laminator is recommended for items to be laminated.

2.The laminator should be located so that when not using the rear rewind, exiting film drops freely to the floor or to a table that is lower than the exit point of the laminator. Accumulation of laminate immediately behind the laminator as it exits the equipment may cause the film to wrap around the rollers, jamming the machine.

3.Avoid locating the laminator near sources of heat or cold. The laminator should not be in the direct path of forced heated or cooled air.

4.Connect the attachment plug provided with the laminator to a suitably grounded outlet only.

Page 4-1

Image 11
Contents 640t Laminator 640t Installation and Operating Instructions Table of Contents 640t Installation and Operating Instructions General SafetyElectrical Limited 90-Day Warranty Warranty640t Installation and Operating Instructions 640t SpecificationsModifications Canada Class a Notice Avis Canada, Classe aTo set up the laminator for the first time InstallationPrior to Installation Installation640t Installation and Operating Instructions Film Shafts Feature guideIdler Bars, Unwind Shafts, Rewind Shafts Rollers and Safety SensorControl Panel and Print Clamp Emergency Stop and TableTension Controls Roller Pressure Handle Media Core Adapter Rewinder Power Power Cord and Foot Switch Speed Section Control PanelTemp Section 640t Installation and Operating Instructions To run the laminator Press RUN or the foot switchOperation General OperationPoly-in and Poly-out Films Loading FilmRemoving and Installing the Feed Table Removing and Installing Print ClampTo remove existing films Loading Film Onto the Supply ShaftsTo web load films the machine Threading Film with a Threading CardTo load films onto the supply shafts 10. Bottom Film or Kraft Paper Stuck to Top Film 12. New Films Tacked to Old Films Loading Film by Tacking New Film to Existing FilmTo run the first pass Decaling in Two PassesTo run the second pass Mounting Only MountingTips For Threading Pressure Sensitive Adhesive PSA Film Pre-Coating BoardsTo align the supply rolls Film Alignment and TensionFilm Alignment Film TensionTo clear a jam Clearing a Film Jam Wrap-upTo test the web Lamination Guide Caring for the 640t Laminator Operator MaintenanceCleaning The Rollers To clean the rollers and idler barSymptom Possible Cause Corrective Action Troubleshooting640t Installation and Operating Instructions Acco Brands Acco Canada Brampton