5.5Rectifier Installation

The APC Model MRF28H54BV rectifiers are shipped in separate containers. Follow the procedure below to install a rectifier.

1)Remove the rectifier from its shipping container.

2)Remove the rectifier retaining screw from the shelf position where the rectifier is to be installed.

3)Slide the rectifier into the shelf between the guides until it is fully seated.

4)Fasten the rectifier in place with the rectifier retaining screw.

Since all adjustments are made from the system control unit, no rectifier adjustments are necessary.

NOTE: All “FLOAT” – “BOOST/EQUALISE” switches (one is located on the front of each rectifier in the system) must be set to “FLOAT” to allow the MX28B to control the output voltage properly.

5.6 Multiple Frame Assembly

5.6.1 Power Bus Connections

Installations with multiple box frames requires splicing of the power buses. The MX28B-1200 / 2400 family of power systems and distribution bays are designed so that the power buses can be connected from bay to bay through the use of simple splice plates. Figure 5-5 shows the connection between two box frames for the normal 2500 amp bus work.

Splice Plates

Figure 5-5 Multi-Bay Splice Plates

18

MX28B-1200/2400

Image 24
Contents Model MX28B-1200/2400 MX28B-1200 Product Manual Revision History Revision Date DescriptionTable of Contents Product Manual Page General Information IntroductionInspection upon Receipt of Goods General Visible External DamageConcealed Damage Return of Damaged GoodsCustomer Service and Support Page Warranty Provisions Warranty ReturnsWarranty Repair or Replacement General ProvisionsMX28B-1200 Product Manual Product Overview and Technical Description DescriptionMX28B-1200 System Diagram Power Output Capacity RectifiersControl Unit AC Input Power Battery connectionsDC Distribution Environmental MechanicalCompliance Page Installation Procedures Preparation Recommended ToolsRecommended Test Equipment Equipment InspectionRoom/Locations MountingVentilation Terminal BlockMX28B-1200 Product Manual Battery Connections Battery Disconnect Connecting the CablesCable Sizing Considerations Rectifier Installation Multiple Frame Assembly Power Bus ConnectionsControl Wiring Extension Multi-Bay Wiring Diagram MX28B-1200 Product Manual Alarm Connections Alarm Interface PC BoardExternal Alarm Inputs External Alarm Input DefinitionExternal Alarm Input Connections Alarm Outputs Alarm Terminal Output Designation User Alarm Notes NO-NC-C Plug-in Circuit BreakersFuse APC Part Rating Power Distribution Fuse Load Connections 10 Fuse Bay ConnectionsBattery Temperature Probe Installation Apply AC PowerStatus Alarms System Modules Batt PIN OEM Full System Power UpPage SETUP, ADJUSTMENTS, and Operation User InterfaceAlarm Output Relays Parameter Locations, Descriptions, and Default ValuesMX28B-1200 Product Manual Alarms Setup PINStatus System SET-ALMDate OUT-RLY RLY-MAPAlias IN-RLY RLY-MAPModules Rect SET-ALM ParamInfo Cirbkr SET-ALMFuse SET-ALM Alias FuseLVD SET-ALM Batt SET-ALMComp PIN OEMAPC OFFMX28B-1200 Product Manual Rect 1ofN Alm m+ Test Relay Batt Disc Alm m+ 48V Fuse 1 Alm LVD1 LVD2MX28B-1200 Product Manual MX28B-1200 Product Manual