BUILDING NETWORK ADAPTER BNA-1C/2CS/2DN

the parameters may be wrong is acceptable.

exit exits the sub-shell and returns to the main shell.

6.5.4load - Load executable

The command load is a direct command which immediately starts downloading the application firmware image into the BNA based on the download configuration defined by the command dc.

After loading the image into local memory the BNA Bootloader starts copying the image into the local Flash memory where it resides until updated the next time.

load accepts optional command-line parameters. Accepted command-line parameters are FTP-ServerIP-Addressand/or filename. Command-line parameters supersede the current download configuration for these elements. Command-line parameters in the load command scope can be used to use an alternative FTP-Server for downloading or to download another application firmware image into the BNA device.

If load fails, then it needs to be checked whether the correct download configuration has been defined. In this case, the command dc test becomes useful.

36

EN1B-0198GE51 R0801

Image 36
Contents Q7055A Technical Data Table of Contents Cables and Connectors Tips & Tricks FAQs GlossaryAbout BNA Building Network Adapter BNA-1C/2CS/2DN Building Network Adapter BNA-1C/2CS/2DN Reset Location of Parts and ControlsFront Side ModeCol Power Ch1Ch2 HeartbeatCh1/Ch2 Bus Termination Switches Rear Side10 Ch1 11 AC/DC12 RS232 14 10BaseTBefore Installation Pieces ItemWA RN I NG BNA Operating Positions Single DeviceStacked Devices Wall MountingPut the BNA-adapter with the topside down on the desk Figure Building Network Adapter BNA-1C/2CS/2DN Power Connection ConnectionsBus Termination Switch Field Bus Connection Ch1 / Ch2Disabled NormalFS90-Bus connections XD508 compatible bus terminationXD508 compatible bus termination enabled L1 Bus TerminationBNA Bootloader Startup BehaviorRED Switching the Operating Mode Operating ModesBuilding Network Adapter BNA-1C/2CS/2DN Switching BNA Operating Mode Device Setup Command Description on Basic network parameters CA UT I on Command Description Help or ? Np Basic network parametersDc Download configuration Building Network Adapter BNA-1C/2CS/2DN Building Network Adapter BNA-1C/2CS/2DN Parameters may be wrong is acceptable Load Load executableVer Show installed software Run Execute installed softwarePing ping Um User managementBuilding Network Adapter BNA-1C/2CS/2DN Admin UserPriv Login Login as different user Whoami Who amBuilding Network Adapter BNA-1C/2CS/2DN Cables and Connectors DB9F Null Modem Cable2shows how to configure a Null Modem Cable DB9F Ethernet Connectors 1 RJ45 ConnectorPin Number Signal Name Connecting a BNA to a HubConnecting a BNA to a Workstation Straight through pinning for BNA to Ethernet Hub connectionsAUI Connector Crossover pinning for BNA to workstation direct- connectionsGND BNA bootloader np display followed by Enter Tips & TricksFAQs Glossary Building Network Adapter BNA-1C/2CS/2DN Page Honeywell