Honeywell Q7055A user manual Connections, Power Connection

Page 19

BUILDING NETWORK ADAPTER BNA-1C/2CS/2DN

5 Connections

This chapter describes how to connect power and the field bus to the BNA device.

Together with the BNA device, a supply pack with installation material is delivered containing the required connectors for power and field bus.

5.1Power Connection

For the BNA device an external power supply with the following specification is required:

18-24V AC (50...60Hz) or 18-24V DC.

Power consumption of the BNA device is 5VA (connected via 10BaseT, twisted pair) or 12VA (connected via AUI, 10Base5).

For the power connection, the 2 pole Phoenix connector is required (included). If an off-the-shelf power supply is used, cut off the original connector at the end of the cable. Then strip the two cable ends and insert each cable end into the openings of the 2 pole Phoenix connector. Fasten them with a screwdriver.

The polarity (+/-) of the 2 pole Phoenix power connector for DC power supplies is don’t care.

EN1B-0198GE51 R0801

19

Image 19
Contents Q7055A Technical Data Table of Contents Tips & Tricks FAQs Glossary Cables and ConnectorsAbout BNA Building Network Adapter BNA-1C/2CS/2DN Building Network Adapter BNA-1C/2CS/2DN Mode ResetLocation of Parts and Controls Front SideCol Heartbeat PowerCh1 Ch2Rear Side Ch1/Ch2 Bus Termination Switches14 10BaseT 10 Ch111 AC/DC 12 RS232Pieces Item Before InstallationWA RN I NG Single Device BNA Operating PositionsWall Mounting Stacked DevicesPut the BNA-adapter with the topside down on the desk Figure Building Network Adapter BNA-1C/2CS/2DN Connections Power ConnectionField Bus Connection Ch1 / Ch2 Bus Termination SwitchXD508 compatible bus termination DisabledNormal FS90-Bus connectionsL1 Bus Termination XD508 compatible bus termination enabledStartup Behavior BNA BootloaderRED Operating Modes Switching the Operating ModeBuilding Network Adapter BNA-1C/2CS/2DN Switching BNA Operating Mode Device Setup Command Description on Basic network parameters CA UT I on Command Description Np Basic network parameters Help or ?Dc Download configuration Building Network Adapter BNA-1C/2CS/2DN Building Network Adapter BNA-1C/2CS/2DN Load Load executable Parameters may be wrong is acceptableUm User management Ver Show installed softwareRun Execute installed software Ping pingBuilding Network Adapter BNA-1C/2CS/2DN User AdminPriv Whoami Who am Login Login as different userBuilding Network Adapter BNA-1C/2CS/2DN DB9F Null Modem Cable Cables and Connectors2shows how to configure a Null Modem Cable DB9F 1 RJ45 Connector Ethernet ConnectorsConnecting a BNA to a Hub Pin Number Signal NameStraight through pinning for BNA to Ethernet Hub connections Connecting a BNA to a WorkstationCrossover pinning for BNA to workstation direct- connections AUI ConnectorGND Tips & Tricks BNA bootloader np display followed by EnterFAQs Glossary Building Network Adapter BNA-1C/2CS/2DN Page Honeywell