8e6 Technologies TAR 1.0 quick start Install the Rack Rails, Install the Server into the Rack

Page 10

Install the Rack Rails

Determine where you want to place the server unit in the rack. Position the fixed rack rail/sliding rail guide assemblies at the desired location in the rack, keeping the sliding rail guide facing the inside of the rack. Screw the assembly securely to the rack using the brackets provided. Attach the other assembly to the other side of the rack, making sure that both are at the exact same height and with the rail guides facing inward.

Install the Server into the Rack

You should now have rails attached to both the chassis and the rack unit. The next step is to install the server chassis into the rack. Do this by lining up the rear of the chassis rails with the front of the rack rails. Slide the chassis rails into the rack rails, keeping the pressure even on both sides (you may have to depress the locking tabs when inserting).

8e6 Threat Analysis Reporter Quick Start Guide

Image 10 Contents
Guide 8e6 Threat Analysis Reporter Quick Start Guide Contents 8e 6 Threat Analysis Reporter Quick Start Guide Threat Analysis Reporter Introduction About this Document Conventions Used in this Document8e6 Corporate Headquarters USA Procedures8e6 Taiwan Unpack the Unit from the Carton Rack Mount the S or MSA Server Rack Setup SuggestionsInstall the Chassis Rails Rack Mount InstructionsInstall the Rack Rails Install the Server into the RackInstalling the Server into a Telco Rack Install the H Server Bezel 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Install the Outer Rails Install the Inner RailsRack Mount the H Server Install the Server into the Rack Installing the Server into a Telco Rack Initial Setup Procedures Serial Console Setup Monitor and Keyboard SetupLink the Workstation to the Threat Analysis Reporter HyperTerminal Setup Procedures 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Step-by-Step Initial Setup Procedures Login screen, password prompts#s3tup#r3k Configure Network Interface screen 8e6 Threat Analysis Reporter Quick Start Guide Configure default gateway screen Configure Domain Name Servers screenConfigure Host Name screen Time zone regional configuration screen Configure Wizard user screen Setup Wizard Confirmation screen Administration menuSystem Status Screen Log Off, Disconnect the PeripheralsPhysically Connect the Unit to the Network Bandwidth ManagementWizard Setup Procedures Access the Threat Analysis Reporter Administrator ConsoleLog in to the Threat Analysis Reporter Administrator Console Register administrator 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Register R3000 & ER R30008e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide 8e 6 Threat Analysis Reporter Quick Start Guide Register Gauges Specify Gauge Groups to be MonitoredView, Edit Gauge Components Server Settings Conclusion Physical Specifications Internal Product SpecificationsHardware Component Specifications FCCLED Indicators and Buttons MSA Front Panel LED Indicators, ButtonsDiagrams and Descriptions LED Indicator KeyOther Required Installation Items Preliminary Setup ProceduresUnpack the Ethernet Tap Unit from the Box Install the Ethernet Tap Unit Ports in front panel of NetOptics 10/100BaseT Tap Tap Installation
Related manuals
Manual 54 pages 32.58 Kb