Preliminary Setup Procedures
Unpack the Unit from the Carton
Inspect the packaging container for evidence of mishandling during transit. If the packag- ing container is damaged, photograph it for reference.
Carefully unpack the unit from the carton and verify that all accessories are included. Save all packing materials in the event that the unit needs to be returned to 8e6 Tech- nologies.
The carton should contain the following items:
•1 Threat Analysis Reporter unit
•1 AC Power Cord
•1 Serial Port Cable
•1
•1
•Rack Mount Brackets (2)
•1 End User License Agreement (EULA)
•1 envelope containing a
Guide. The latest version of the user guide can be obtained from our Web site at http://www.8e6.com/docs/tar_ug.pdf.
NOTE: TAR “S” and “H” units come with a NetOptics 10/100BaseT Ethernet Tap kit to be installed at your option. TAR “H” units also come with a separate bezel to be installed on the front of the chassis, and an additional AC power cord.
Inspect the server and accessories for damage. If the contents appear damaged, file a damage claim with the carrier immediately.
For “S” and “MSA” units, proceed to the instructions for Rack Mount the “S” or “MSA” Server.
For “H” units, proceed to the instructions for Install the “H” Server Bezel, followed by Rack Mount the “H” Server.
8e6 Threat Analysis Reporter Quick Start Guide |