8e6 Technologies TAR 1.0 quick start Installing the Server into a Telco Rack

Page 11

Installing the Server into a Telco Rack

If you are installing the 8e6 server unit into a Telco type rack, follow the directions given on the previous pages for rack installation. The only difference in the installation pro- cedure will be the positioning of the rack brackets to the rack. They should be spaced apart just enough to accommodate the width of the Telco rack.

8e6 Threat Analysis Reporter Quick Start Guide



Image 11
Contents Guide 8e6 Threat Analysis Reporter Quick Start Guide Contents 8e 6 Threat Analysis Reporter Quick Start Guide Threat Analysis Reporter Introduction Conventions Used in this Document About this Document8e6 Taiwan Procedures8e6 Corporate Headquarters USA Unpack the Unit from the Carton Rack Mount Instructions Rack Setup SuggestionsInstall the Chassis Rails Rack Mount the S or MSA ServerInstall the Server into the Rack Install the Rack RailsInstalling the Server into a Telco Rack Install the H Server Bezel 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Rack Mount the H Server Install the Inner RailsInstall the Outer Rails Install the Server into the Rack Installing the Server into a Telco Rack Initial Setup Procedures Link the Workstation to the Threat Analysis Reporter Monitor and Keyboard SetupSerial Console Setup HyperTerminal Setup Procedures 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Login screen, password prompts Step-by-Step Initial Setup Procedures#s3tup#r3k Configure Network Interface screen 8e6 Threat Analysis Reporter Quick Start Guide Configure Domain Name Servers screen Configure default gateway screenConfigure Host Name screen Time zone regional configuration screen Configure Wizard user screen Administration menu Setup Wizard Confirmation screenLog Off, Disconnect the Peripherals System Status ScreenBandwidth Management Physically Connect the Unit to the NetworkAccess the Threat Analysis Reporter Administrator Console Wizard Setup ProceduresLog in to the Threat Analysis Reporter Administrator Console Register administrator 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide R3000 Register R3000 & ER8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide 8e 6 Threat Analysis Reporter Quick Start Guide Specify Gauge Groups to be Monitored Register GaugesView, Edit Gauge Components Server Settings Conclusion Internal Product Specifications Physical SpecificationsFCC Hardware Component SpecificationsLED Indicator Key MSA Front Panel LED Indicators, ButtonsDiagrams and Descriptions LED Indicators and ButtonsUnpack the Ethernet Tap Unit from the Box Preliminary Setup ProceduresOther Required Installation Items Install the Ethernet Tap Unit Ports in front panel of NetOptics 10/100BaseT Tap Tap Installation