8e6 Technologies TAR 1.0 quick start 8e6 Threat Analysis Reporter Quick Start Guide

Page 13

A.Remove the plastic wrapping from the left and right ears.

B.On one side of the chassis (left or right), un- screw the inner rail from the chassis.

C.Slide the loosened inner rail slightly backwards to release it from the clips at the side of the chassis, and then lay it down beside the chas- sis, with the inside of the rail facing up.

D.On the inner rail that is still attached to the chassis, insert the bezel pin into the bottom hole of the ear. Be sure the pin is pushed all the way in so that it is flush against the ear.

E.Take up the free end of the bezel and also the loosened inner rail.

8e6 Threat Analysis Reporter Quick Start Guide



Image 13 Contents
Guide 8e6 Threat Analysis Reporter Quick Start Guide Contents 8e 6 Threat Analysis Reporter Quick Start Guide Threat Analysis Reporter Introduction Conventions Used in this Document About this Document8e6 Corporate Headquarters USA Procedures8e6 Taiwan Unpack the Unit from the Carton Install the Chassis Rails Rack Setup SuggestionsRack Mount the S or MSA Server Rack Mount InstructionsInstall the Server into the Rack Install the Rack RailsInstalling the Server into a Telco Rack Install the H Server Bezel 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Install the Outer Rails Install the Inner RailsRack Mount the H Server Install the Server into the Rack Installing the Server into a Telco Rack Initial Setup Procedures Serial Console Setup Monitor and Keyboard SetupLink the Workstation to the Threat Analysis Reporter HyperTerminal Setup Procedures 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Login screen, password prompts Step-by-Step Initial Setup Procedures#s3tup#r3k Configure Network Interface screen 8e6 Threat Analysis Reporter Quick Start Guide Configure Domain Name Servers screen Configure default gateway screenConfigure Host Name screen Time zone regional configuration screen Configure Wizard user screen Administration menu Setup Wizard Confirmation screenLog Off, Disconnect the Peripherals System Status ScreenBandwidth Management Physically Connect the Unit to the NetworkAccess the Threat Analysis Reporter Administrator Console Wizard Setup ProceduresLog in to the Threat Analysis Reporter Administrator Console Register administrator 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide R3000 Register R3000 & ER8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide 8e 6 Threat Analysis Reporter Quick Start Guide Specify Gauge Groups to be Monitored Register GaugesView, Edit Gauge Components Server Settings Conclusion Internal Product Specifications Physical SpecificationsFCC Hardware Component SpecificationsDiagrams and Descriptions MSA Front Panel LED Indicators, ButtonsLED Indicators and Buttons LED Indicator KeyOther Required Installation Items Preliminary Setup ProceduresUnpack the Ethernet Tap Unit from the Box Install the Ethernet Tap Unit Ports in front panel of NetOptics 10/100BaseT Tap Tap Installation
Related manuals
Manual 54 pages 32.58 Kb