8e6 Technologies TAR 1.0 quick start Initial Setup Procedures

Page 18

Install the Server

Step 1: Initial Setup Procedures

This step requires you to link the workstation to the Threat Analysis Reporter. The follow- ing hardware can be used for the initial setup procedures:

Threat Analysis Reporter unit with AC power cord

either one of two options:

PC monitor with AC power cord and keyboard, or

PC laptop computer with HyperTerminal and serial port cable (and USB DB9 se- rial adapter, if there is no serial port on your laptop)

NOTE: Before installing the Threat Analysis Reporter server, the R3000 server to be used with this server must already be installed and running software version 1.10.15 or higher.

14

8e6 Threat Analysis Reporter Quick Start Guide

Image 18 Contents
Guide 8e6 Threat Analysis Reporter Quick Start Guide Contents 8e 6 Threat Analysis Reporter Quick Start Guide Threat Analysis Reporter Introduction About this Document Conventions Used in this DocumentProcedures 8e6 Corporate Headquarters USA8e6 Taiwan Unpack the Unit from the Carton Rack Mount the S or MSA Server Rack Setup SuggestionsInstall the Chassis Rails Rack Mount InstructionsInstall the Rack Rails Install the Server into the RackInstalling the Server into a Telco Rack Install the H Server Bezel 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Install the Inner Rails Install the Outer RailsRack Mount the H Server Install the Server into the Rack Installing the Server into a Telco Rack Initial Setup Procedures Monitor and Keyboard Setup Serial Console SetupLink the Workstation to the Threat Analysis Reporter HyperTerminal Setup Procedures 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Step-by-Step Initial Setup Procedures Login screen, password prompts#s3tup#r3k Configure Network Interface screen 8e6 Threat Analysis Reporter Quick Start Guide Configure default gateway screen Configure Domain Name Servers screenConfigure Host Name screen Time zone regional configuration screen Configure Wizard user screen Setup Wizard Confirmation screen Administration menuSystem Status Screen Log Off, Disconnect the PeripheralsPhysically Connect the Unit to the Network Bandwidth ManagementWizard Setup Procedures Access the Threat Analysis Reporter Administrator ConsoleLog in to the Threat Analysis Reporter Administrator Console Register administrator 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Register R3000 & ER R30008e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide 8e 6 Threat Analysis Reporter Quick Start Guide Register Gauges Specify Gauge Groups to be MonitoredView, Edit Gauge Components Server Settings Conclusion Physical Specifications Internal Product SpecificationsHardware Component Specifications FCCLED Indicators and Buttons MSA Front Panel LED Indicators, ButtonsDiagrams and Descriptions LED Indicator KeyPreliminary Setup Procedures Other Required Installation ItemsUnpack the Ethernet Tap Unit from the Box Install the Ethernet Tap Unit Ports in front panel of NetOptics 10/100BaseT Tap Tap Installation
Related manuals
Manual 54 pages 32.58 Kb