8e6 Technologies TAR 1.0 quick start Rack Mount the S or MSA Server, Rack Mount Instructions

Page 9

Rack Mount the “S” or “MSA” Server

Rack Mount Instructions

Rack Setup Suggestions

Determine the placement of each component in the rack before you install the rails.

Install the heaviest server components on the bottom of the rack first, and then work up.

Identify the Sections of the Rack Rails

You should have received two rack rail assemblies with the 8e6 server unit. Each of these assemblies consists of two sections: An inner fixed chassis rail that secures to the unit (A), and an outer fixed rack rail that secures directly to the rack itself (B). A sliding rail guide sandwiched between the two should remain attached to the fixed rack rail. The A and B rails must be detached from each other in order to install.

To remove the fixed chassis rail (A), pull it out as far as possible. You should hear a “click” sound as a locking tab emerges from inside the rail assembly and locks the inner rail. Then depress the locking tab to pull the inner rail completely out. Do this for both the left and right side rack rail.

Install the Chassis Rails

Position the fixed chassis rail sections you just removed along the side of the server chassis making sure the five screw holes line up. Note that these two rails are left/right specific. Screw the rail securely to the side of the chassis. Repeat this procedure for the other rail on the other side of the chassis. You will also need to attach the rail brackets when installing into a Telco rack.

Locking Tabs: As you have seen, both chassis rails have a locking tab, which serves two functions. The first is to lock the server into place when installed and pushed fully into the rack, which is its normal position. Secondly, these tabs also lock the server in place when fully extended from the rack. This prevents the server from coming com- pletely out of the rack when you pull it out for servicing.

8e6 Threat Analysis Reporter Quick Start Guide



Image 9
Contents Guide 8e6 Threat Analysis Reporter Quick Start Guide Contents 8e 6 Threat Analysis Reporter Quick Start Guide Threat Analysis Reporter Introduction Conventions Used in this Document About this DocumentProcedures 8e6 Corporate Headquarters USA8e6 Taiwan Unpack the Unit from the Carton Install the Chassis Rails Rack Setup SuggestionsRack Mount the S or MSA Server Rack Mount InstructionsInstall the Server into the Rack Install the Rack RailsInstalling the Server into a Telco Rack Install the H Server Bezel 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Install the Inner Rails Install the Outer RailsRack Mount the H Server Install the Server into the Rack Installing the Server into a Telco Rack Initial Setup Procedures Monitor and Keyboard Setup Serial Console SetupLink the Workstation to the Threat Analysis Reporter HyperTerminal Setup Procedures 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Login screen, password prompts Step-by-Step Initial Setup Procedures#s3tup#r3k Configure Network Interface screen 8e6 Threat Analysis Reporter Quick Start Guide Configure Domain Name Servers screen Configure default gateway screenConfigure Host Name screen Time zone regional configuration screen Configure Wizard user screen Administration menu Setup Wizard Confirmation screenLog Off, Disconnect the Peripherals System Status ScreenBandwidth Management Physically Connect the Unit to the NetworkAccess the Threat Analysis Reporter Administrator Console Wizard Setup ProceduresLog in to the Threat Analysis Reporter Administrator Console Register administrator 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide R3000 Register R3000 & ER8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide 8e 6 Threat Analysis Reporter Quick Start Guide Specify Gauge Groups to be Monitored Register GaugesView, Edit Gauge Components Server Settings Conclusion Internal Product Specifications Physical SpecificationsFCC Hardware Component SpecificationsDiagrams and Descriptions MSA Front Panel LED Indicators, ButtonsLED Indicators and Buttons LED Indicator KeyPreliminary Setup Procedures Other Required Installation ItemsUnpack the Ethernet Tap Unit from the Box Install the Ethernet Tap Unit Ports in front panel of NetOptics 10/100BaseT Tap Tap Installation