8e6 Technologies TAR 1.0 quick start Install the H Server Bezel

Page 12

Install the “H” Server Bezel

Before rack mounting the “H” unit, the bezel should be installed on the front end of the chassis. This portion of the installation process requires you to unpack the unit and be- zel.

NOTE: The bezel has been packaged separately from the unit to prevent dam- age during shipping.

Front of bezel

Outside of left inner rail

Inside front end of left inner

 

rail

Inner left rail attached to chassis

Pin on right side of bezel

8e6 Threat Analysis Reporter Quick Start Guide

Image 12 Contents
Guide 8e6 Threat Analysis Reporter Quick Start Guide Contents 8e 6 Threat Analysis Reporter Quick Start Guide Threat Analysis Reporter Introduction About this Document Conventions Used in this DocumentProcedures 8e6 Corporate Headquarters USA8e6 Taiwan Unpack the Unit from the Carton Rack Setup Suggestions Install the Chassis RailsRack Mount the S or MSA Server Rack Mount InstructionsInstall the Rack Rails Install the Server into the RackInstalling the Server into a Telco Rack Install the H Server Bezel 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Install the Inner Rails Install the Outer RailsRack Mount the H Server Install the Server into the Rack Installing the Server into a Telco Rack Initial Setup Procedures Monitor and Keyboard Setup Serial Console SetupLink the Workstation to the Threat Analysis Reporter HyperTerminal Setup Procedures 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Step-by-Step Initial Setup Procedures Login screen, password prompts#s3tup#r3k Configure Network Interface screen 8e6 Threat Analysis Reporter Quick Start Guide Configure default gateway screen Configure Domain Name Servers screenConfigure Host Name screen Time zone regional configuration screen Configure Wizard user screen Setup Wizard Confirmation screen Administration menuSystem Status Screen Log Off, Disconnect the PeripheralsPhysically Connect the Unit to the Network Bandwidth ManagementWizard Setup Procedures Access the Threat Analysis Reporter Administrator ConsoleLog in to the Threat Analysis Reporter Administrator Console Register administrator 8e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide Register R3000 & ER R30008e6 Threat Analysis Reporter Quick Start Guide 8e6 Threat Analysis Reporter Quick Start Guide 8e 6 Threat Analysis Reporter Quick Start Guide Register Gauges Specify Gauge Groups to be MonitoredView, Edit Gauge Components Server Settings Conclusion Physical Specifications Internal Product SpecificationsHardware Component Specifications FCCMSA Front Panel LED Indicators, Buttons Diagrams and DescriptionsLED Indicators and Buttons LED Indicator KeyPreliminary Setup Procedures Other Required Installation ItemsUnpack the Ethernet Tap Unit from the Box Install the Ethernet Tap Unit Ports in front panel of NetOptics 10/100BaseT Tap Tap Installation
Related manuals
Manual 54 pages 32.58 Kb