MICROBOARDS TECHNOLOGY, LLC | HCL Series |
The loader will continue to remove discs from the input spindle and place those into drives until either all of the drives are full, or the count that you loaded into the counter is reached.
Processing...
Please Wait
It takes a few seconds for the autoloader to recognize all the discs.
After two or three seconds of processing time, one of the following Copy Progress screens will appear.
Copying... | H4012MB |
0/21 | 12% |
¾“H” indicates the source of the job resides in the Hard Drive.
¾“4012MB” indicates the capacity of the master disc.
¾“12%” indicates the current progress of the duplication.
¾“0/21” indicates you have a project size of 21 copies and you have made 0 copies so far.
or:
Copying... H4012MB
012%
¾“H” indicates the source of the job resides in the Hard Drive.
¾“4012MB” indicates the capacity of the master disc.
¾“12%” indicates the current progress of the duplication.
¾“0” indicates you have made 0 copies so far.
Note: It is normal to see the progress indicator stay at
Loader Processing Drive 1 -> Output Bin
Once the duplication run is completed, the loader will remove the finished disc from the drive and place the successful copy on the Output Spindle. If there are any unsuccessful, they will be placed in the reject area.
The loader will then pick up another blank disc and load it into the drive. This is then repeated for each disc.
Loader Processing Drive 2 <- Input Bin
The copying process will continue until you either run out of blank discs or until the count that you loaded into the counter is reached.
If you run out of blank discs and the job is not complete, the autoloader will give you an opportunity to fill the spindle:
Important: When you add discs to the input spindle, be sure to remove your finished discs from the Output Spindle.
Input Bin Empty(20) Continue?
At this point you can either put more discs on to the input spindle and press the OK button to continue, or press the ESC button to terminate your project.
Once the autoloader is through, you will see the following screen:
PASS 100 FAIL 0
Job Completed! Press OK to Finish
“PASS 100" indicates that you made 100 successful copies. “FAIL 0" indicates that you have no failures for this job.
At the bottom of the screen, you will see the scrolling message: “Job Complete! Press OK to Finish”
Press the OK button once again and you shall see the “Access Log” menu. You can press the OK button one more time to see the log that indicates the number of passes and fails for every drive/tray, or simply press the ESC button to go back to the main menu. It is highly recommended to check the log when your job has an abnormal amount of failures.
15