2.3 Initial Operation
1.After confirming proper supply voltage, turn on the instrument power. If you are unfamiliar with the M200EU with NOy Option, we recommend that you read the overview in Section 3 before proceeding.
The power indicator light and display should immediately light, in addition the bypass pump should start up. The Bypass Pump Chassis requires about 30 minutes for the converter to come up to temperature.
While the converter is coming up to temperature, the M200EU analyzer should be
After 30 min, the display on the Bypass Pump Chassis should read 315oC, indicating that the converter is up to temperature.
2.Proceed to Section 4 of this manual to do a Zero/Span check.
Table 1 Final Test and Calibration Values
| Test Values | Observed Value | Units | Nominal Range |
| |
|
|
|
|
|
|
|
| CONVERTER TEMP |
| oC | 315 | 7 |
|
| BYPASS FLOW – NO CHANNEL |
| CC/MIN | 800 | 80 |
|
|
|
|
|
|
| |
| BYPASS FLOW – NOy CHANNEL |
| CC/MIN | 800 ± 80 |
| |
|
|
|
|
|
|
|
Converter Serial # __________________________ |
|
|
|
| ||
Date _______________________ |
| Technician _____________________ |
05386 Rev. D | 9 |