Teledyne 05386D manual Table of Contents

Page 7

Table of Contents

 

Safety Messages

i

Table of Contents

iii

List of Figures

iv

List of Tables

iv

1.0

INTRODUCTION

5

2.0

GETTING STARTED

7

2.1

Unpacking

7

2.2

Electrical and Pneumatic Connections

7

2.3

Initial Operation

9

3.0 SPECIFICATIONS, WARRANTY

11

3.1

Specifications

11

3.2

Warranty

12

4.0 THE M200EU-NOYCONVERTER

13

4.1

Principle of Operation

13

5.0 CALIBRATION AND ZERO/SPAN CHECKS

15

5.1

Calibration or Cal Check Procedure

16

6.0 MAINTENANCE

19

6.1

Maintenance Schedule

19

6.2

Replacing the Sample Particulate Filters

20

6.3

Checking Analyzer Flow Rate

22

6.4

Replacing the Converter

22

6.5

Inspecting Pneumatic Lines

24

6.6

Checking for Leaks

27

7.0

TROUBLESHOOTING, ADJUSTMENTS

29

7.1

Operation Verification – Diagnostic Techniques

30

7.1.1 Pneumatic System

30

7.1.2 Leak Check

32

7.1.3 Bypass Pump Diagnostic Procedures

32

7.1.4 Electrical Fault Isolation

32

7.2

Setting the Converter Temperature

32

7.2.1 Temperature Controller Setup

32

05386 Rev. D

iii

Image 7
Contents M200EU-NOy Converter Page Page Page Safety Messages 05386 Rev. D Table of Contents List of Tables List of FiguresIntroduction This page intentionally left blank 05386 Rev. D Unpacking Getting StartedElectrical and Pneumatic Connections Rear Panel Pneumatic Connections Final Test and Calibration Values Initial OperationThis page intentionally left blank 05386 Rev. D Specifications SPECIFICATIONS, WarrantyTeledyne Advanced Pollution INSTRUMENTATION, INC WarrantyPrinciple of Operation M200EU-NOYCONVERTERThis page intentionally left blank 05386 Rev. D Calibration and ZERO/SPAN Checks Calibration or Cal Check Procedure Span Calibration Procedure This page intentionally left blank 05386 Rev. D Maintenance Schedule MaintenanceReplacing the Sample Particulate Filters Replacing the Particulate Filter Replacing the Converter Checking Analyzer Flow RateNOy Converter Assembly Inspecting Pneumatic Lines Pneumatics diagram standard and Z/S option Pneumatic diagram OPT 86 option Sample Driers Checking for Leaks This page intentionally left blank 05386 Rev. D TROUBLESHOOTING, Adjustments Operation Verification Diagnostic Techniques Pneumatic system is diagramed 05386 Rev. D Bypass Pump Diagnostic Procedures Setting the Converter TemperatureLOC Lock AH Alarm Electrical Diagram This page intentionally left blank 05386 Rev. D Description M200EU-NOYSPARE Parts List