ASSEMBLY INSTRUCTIONS
STEP 13
Slide the LEFT and RIGHT PULLEY SLIDERS(36, 37) onto the UPRIGHT TUBES(34) and lock in position by screwing the SPRING PINS(39) into the PULLEY SLIDERS(36, 37).
STEP 14
Insert both ends of the TOP BEAM(35) onto the UPRIGHT TUBES(34) and secure with BUTTON HEAD
BOLTS(M8x1.25x15mm)(85).
STEP 15
Position the LEFT and RIGHT PULLEY SLIDERS(36, 37) as shown. Slide the PULLEY SPACERS(41) onto the PULLEY SETS(40) and attach the PULLEY SETS(40) to the LEFT and RIGHT PULLEY SLIDERS(36, 37) with WASHERS(M8)(104) and NYLOCK NUTS(M8x1.25)(103).
STEP 16
Attach the shoulder pads to the CARRIAGE(42) by inserting the SHOULDER PAD SUPPORTS(117, 118) into the holes on the CARRIAGE(42) and secure with the HANDLEBARS(119).
NOTE: The posts on the bottom of the SHOULDER PAD SUPPORTS(117, 118) are offset so you can install the supports in two positions. One position is one inch wider to accommodate broader shoulders, another position is for narrower shoulders. To adjust, switch the position of the SHOULDER PAD SUPPORTS(117, 118) and secure with the HANDLEBAR(119).
12