Fujitsu RX600 S4 manual Contents

Page 4

Contents

9

Battery for the RAID5 controller

. . . . . . .

. . . . . . .

.

. 43

9.1

Installing the battery (iBBU) .

. . . . . . . .

. . . . . . .

.

. 43

10 Completion . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47

10.1Closing the server . . . . . . . . . . . . . . . . . . . . . . . . 47

Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49

Index . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57

Options Guide

RX600 S4

Image 4
Contents Primergy RX600 S4 Server Comments… Suggestions… Corrections… Certified documentation according to DIN EN ISOContents Contents Concept and target group of this manual PrefaceDocumentation overview Further sources of information Extensions and conversions Notational conventions Notational conventions Preface ServerView Remote ManagementProcedure Page Safety instructions Before starting upInstallation and operation Safety instructions Batteries Working with CDs/DVDs and CD/DVD drivesLaser information RX600 S4 Preparation Opening the serverRemoving the housing cover Opening the server PreparationMain memory Page Installing additional processors ProcessorsInstalling additional processors Removing the processor coverProcessors Removing the dummy heat sinkInstalling the processor Opening the socket leverInstalling the heat sink Fastening the heat sinkMounting the processor cover Mounting the processor coverReplacing a processor Removing the heat sinkInstalling the new processor Replacing a processorProcessors Page Installing the CD/DVD drive Accessible drivesRemoving the module frame Installing the CD/DVD drive Mounting a CD/DVD driveAccessible drives Mounting the drive in its frameConnecting a CD/DVD drive Installing a tape drive Installing a tape drive Module frame with sliding railsFastening the sliding rails on the drive Connecting the tape drive Mounting the tape driveCable routing from the tape to the PCI controller Page Installing controllers Controllers in non-hot-plug PCI slotsInstalling controllers Installing a controller in a non-hot-plug PCI slotBattery for the RAID5 controller Installing the battery iBBUInstalling the battery iBBU Position of the SAS riser card in the serverBattery for the RAID5 controller SAS riser card top and battery iBBU bottomPage Completion Closing the serverPage Abbreviations Abbreviations EMP IBBU LED RoHS PS/2RoMB SBE VRM Index RAID5