Fujitsu RX600 S4 manual Installing a tape drive, Removing the module frame

Page 35

Accessible drives

Installing a tape drive

7.2Installing a tape drive

A tape drive can be installed in the bay in the middle of the server. If no device is installed in the bay, it contains only the module frame.

Removing the module frame

ÊOpen the server as described in the chapter “Preparation” on page 17f.

B

A

A

Figure 19: Removing the module frame

ÊPress the two blue points on the spring clips on the module frame (A) and push the module frame forward out of the server (B).

RX600 S4

Options Guide

35

Image 35
Contents Primergy RX600 S4 Server Certified documentation according to DIN EN ISO Comments… Suggestions… Corrections…Contents Contents Documentation overview PrefaceConcept and target group of this manual Further sources of information Extensions and conversions Notational conventions Preface ServerView Remote Management Notational conventionsProcedure Page Before starting up Safety instructionsInstallation and operation Safety instructions Working with CDs/DVDs and CD/DVD drives BatteriesLaser information RX600 S4 Opening the server PreparationOpening the server Preparation Removing the housing coverMain memory Page Processors Installing additional processorsRemoving the processor cover Installing additional processorsRemoving the dummy heat sink ProcessorsOpening the socket lever Installing the processorFastening the heat sink Installing the heat sinkMounting the processor cover Mounting the processor coverRemoving the heat sink Replacing a processorReplacing a processor Installing the new processorProcessors Page Removing the module frame Accessible drivesInstalling the CD/DVD drive Mounting a CD/DVD drive Installing the CD/DVD driveMounting the drive in its frame Accessible drivesConnecting a CD/DVD drive Installing a tape drive Module frame with sliding rails Installing a tape driveFastening the sliding rails on the drive Mounting the tape drive Connecting the tape driveCable routing from the tape to the PCI controller Page Controllers in non-hot-plug PCI slots Installing controllersInstalling a controller in a non-hot-plug PCI slot Installing controllersInstalling the battery iBBU Battery for the RAID5 controllerPosition of the SAS riser card in the server Installing the battery iBBUSAS riser card top and battery iBBU bottom Battery for the RAID5 controllerPage Closing the server CompletionPage Abbreviations Abbreviations EMP IBBU LED RoMB PS/2RoHS SBE VRM RAID5 Index