Fujitsu RX600 S4 manual Fastening the sliding rails on the drive

Page 37

Accessible drives

Installing a tape drive

 

 

 

 

 

 

Figure 21: Fastening the sliding rails on the drive

ÊFasten the two sliding rails on both sides of the drive to be installed using two screws for each.

Figure 22: Inserting the tape drive

ÊPush the accessible drive into the empty bay as far as it will go, so that it slots into place.

RX600 S4

Options Guide

37

Image 37
Contents Primergy RX600 S4 Server Certified documentation according to DIN EN ISO Comments… Suggestions… Corrections…Contents Contents Concept and target group of this manual PrefaceDocumentation overview Further sources of information Extensions and conversions Notational conventions Preface ServerView Remote Management Notational conventionsProcedure Page Before starting up Safety instructionsInstallation and operation Safety instructions Working with CDs/DVDs and CD/DVD drives BatteriesLaser information RX600 S4 Opening the server PreparationOpening the server Preparation Removing the housing coverMain memory Page Processors Installing additional processorsRemoving the processor cover Installing additional processorsRemoving the dummy heat sink ProcessorsOpening the socket lever Installing the processorFastening the heat sink Installing the heat sinkMounting the processor cover Mounting the processor coverRemoving the heat sink Replacing a processorReplacing a processor Installing the new processorProcessors Page Installing the CD/DVD drive Accessible drivesRemoving the module frame Mounting a CD/DVD drive Installing the CD/DVD driveMounting the drive in its frame Accessible drivesConnecting a CD/DVD drive Installing a tape drive Module frame with sliding rails Installing a tape driveFastening the sliding rails on the drive Mounting the tape drive Connecting the tape driveCable routing from the tape to the PCI controller Page Controllers in non-hot-plug PCI slots Installing controllersInstalling a controller in a non-hot-plug PCI slot Installing controllersInstalling the battery iBBU Battery for the RAID5 controllerPosition of the SAS riser card in the server Installing the battery iBBUSAS riser card top and battery iBBU bottom Battery for the RAID5 controllerPage Closing the server CompletionPage Abbreviations Abbreviations EMP IBBU LED RoHS PS/2RoMB SBE VRM RAID5 Index