Fujitsu RX600 S4 manual Abbreviations

Page 49

Abbreviations

The specialist terms and abbreviations listed here are not a complete list of all common terms or abbreviations.

AC

Alternating Current

ACPI

Advanced Configuration and Power Interface

ANSI

American National Standards Institute

ASR&R

Automatic Server Reconfiguration and Restart

BBU

Battery Backup Unit

BIOS

Basic Input-Output System

BMC

Baseboard Management Controller

BTU

British Thermal Unit

CC

Cache Coherency

CD-ROM

Compact Disk-Read Only Memory

CHS

Cylinder Head Sector

CMOS

Complementary Metal Oxide Semiconductor

RX600 S4

Options Guide

49

Image 49
Contents Primergy RX600 S4 Server Certified documentation according to DIN EN ISO Comments… Suggestions… Corrections…Contents Contents Concept and target group of this manual PrefaceDocumentation overview Further sources of information Extensions and conversions Notational conventions Preface ServerView Remote Management Notational conventionsProcedure Page Before starting up Safety instructionsInstallation and operation Safety instructions Working with CDs/DVDs and CD/DVD drives BatteriesLaser information RX600 S4 Opening the server PreparationOpening the server Preparation Removing the housing coverMain memory Page Processors Installing additional processorsRemoving the processor cover Installing additional processorsRemoving the dummy heat sink ProcessorsOpening the socket lever Installing the processorFastening the heat sink Installing the heat sinkMounting the processor cover Mounting the processor coverRemoving the heat sink Replacing a processorReplacing a processor Installing the new processorProcessors Page Installing the CD/DVD drive Accessible drivesRemoving the module frame Mounting a CD/DVD drive Installing the CD/DVD driveMounting the drive in its frame Accessible drivesConnecting a CD/DVD drive Installing a tape drive Module frame with sliding rails Installing a tape driveFastening the sliding rails on the drive Mounting the tape drive Connecting the tape driveCable routing from the tape to the PCI controller Page Controllers in non-hot-plug PCI slots Installing controllersInstalling a controller in a non-hot-plug PCI slot Installing controllersInstalling the battery iBBU Battery for the RAID5 controllerPosition of the SAS riser card in the server Installing the battery iBBUSAS riser card top and battery iBBU bottom Battery for the RAID5 controllerPage Closing the server CompletionPage Abbreviations Abbreviations EMP IBBU LED RoHS PS/2RoMB SBE VRM RAID5 Index