Status on the FC call interface; special situation with FC versions

With the FCs AG_SEND (FC 5) and AG_RECV (FC 6), you receive the follo- wing return values after a connection is aborted:

SAG_SEND: DONE=1; ERROR=0; Status=0000H

SAG_RECV: DONE=0; ERROR=1; Status=8183H

The new FCs for longer data fields (FC AG_LSEND and AG_LRECV) react in exactly the same way to a connection abort, in other words with the return values

SDONE=0; ERROR=1; Status=8183

Influence of MPI Connections on Connections via Industrial Ethernet

If a station on MPI is added or removed, for example because a service PG has been connected or disconnected, it is possible that all the connections on the communications bus are aborted. This has the following effects on the communication connections on Industrial Ethernet:

SAll S7 connections are temporarily aborted.

SThe ISO Transport connections on which a job with a data length > 240 bytes is being processed are aborted.

The return values must be handled accordingly on the FC interface in the user program.

2 Installation

2.1Module Accessories

The accessories required to attach the CP 343-1 to an Industrial Ethernet LAN must be ordered separately. For more detailed information, see /9/, /10/, /12/.

Product information CP 343–1

11

C79000–Z8964–C038–05

 

Image 13
Contents Stand/ Dated/ Edition/ Versione/ Versiòn 06/99 Produktinformation6GK7 343-1BA00-0XE0 Attenzione Contents Copyright E Siemens AG 1998..1999 All rights reserved Safety GuidelinesDesign ApplicationConfiguration CharacteristicsServices Requirements General Operation Extended Functions Compared with VersionRequirements ISO Transport Connections Characteristics of ISO Transport Connections Characteristics of S7 CommunicationPerformance Data Reaction Times of ISO Transport ConnectionsCP Operating Mode Displays and Mode SelectorLED Displays Mode Selector Controlling the Operating ModeDownloading Firmware Further Information on OperationGroup status 8183 on the FC call interface Module Accessories InstallationSteps in Installation ProcedurePG/PC Connection Attaching the CP 343-1 to Industrial Ethernet Optical Switch Modul OSM General Technical Data Technical DataPinout Connector for Industrial EthernetProduct name Installation GuidelinesEU Directive EMC89/336/EEC Area of ApplicationOrder Numbers Contains detailed informationDear customer 90713 Fürth
Related manuals
Manual 56 pages 42.23 Kb