Texas Instruments 3000 MCU manual Install T1 Remote Module at Local Site

Page 14

SpectraLink Corporation

T1 Remote Module Installation

 

Link WTS – Link 3000 MCU

3. Install T1 Remote Module at Local Site

Before installing the hardware at the remote site, the Primary shelf at the local site must have a T1 Remote Module (CRC301) installed. Install one Remote Module for each remote shelf to be installed.

Slide the Remote Module into slot 1 or slot 3-12of any shelf, until the card clicks into place. Tighten the screws at the top and bottom of the card to secure it. The Remote Module can go in any slot, in any shelf of the system, except slot 2.

Cards contain components that may be damaged by electrostatic discharge. Before handling any of the cards, the installer must attach the grounding strap (included in the Administration Kit) to his or her wrist, and attach the other end of the strap to ground. Only handle the cards by their edges. Do not touch connector contact areas, do not lift cards by any of the components, and do not lay cards down on their component sides. When laying a card down, place it component side up on top of the anti-static bag in which it was shipped.

Connect Intershelf Junction Panel

Connect two RJ-45 cables from the System Controller ports in the T1 Remote Module to the corresponding shelf ports on the Intershelf Junction Panel (JPI300). Be sure the RJ- 45 cable in Connector A on the Remote Module goes to the A connector on the JPI300, and that Connector B goes to the B Connector.

The following diagram outlines the ports on the JPI.

to

Controller

Connector

RJ

System

21

 

-

 

SHELF 2-6

 

SHELF 7-11

 

SHELF 12-16

 

SHELF 17-20

 

A

B

A

B

A

B

A

B

2

 

7

 

12

 

17

 

3

 

8

 

13

 

18

 

4

 

9

 

14

 

19

 

5

 

10

 

15

 

20

 

6

 

11

 

16

 

AUX

 

RJ-45 Connectors to

Shelf Controllers

Part Number: 72-0059-06-E.doc

Page 14

Image 14
Contents T1 Remote Module Installation Trademark Information Part Number 72-0059-06-E.doc UL Information FCC Information Industry Canada IC Notice Table of Contents Icons Used in this Document About This DocumentContacting SpectraLink Location a Local Remote Installation Steps Overview Site Preparation Required Materials Provided by CustomerT1 Configuration Requirements Channel Service Unit CSUCheck Components Install T1 Remote Module at Local Site Connect Intershelf Junction PanelNetwork Clocked T1 Facilities Alarm Survey Site Install System at Remote SiteInstall Shelves Connect Power to Shelves Install CardsConnect Cables to T1 Remote Module Connect Multiple Remote ShelvesAlarm Connect Demarc Block RJ-21 Cables to Interface Modules Configure Remote System Configure Remote ShelfMaster Clock Configuration Test SystemSite Certification Installation Forms Base Station Location Form Shelf Number Interface ModuleExtension Assignments Worksheet Shelf Interface ModuleSite Preparation Checklist Monday through Friday, 7 AM to 6 PM MTCustomer Acceptance Form QtyIndex Customer Acceptance Form