Texas Instruments 3000 MCU manual Master Clock Configuration, Test System

Page 23

SpectraLink Corporation

T1 Remote Module Installation

 

Link WTS – Link 3000 MCU

5.2Master Clock Configuration

If the T1 facilities are Network Clocked, one shelf must be designated as the Master Clock Source.

1.From the Operator’s Console, select F8, Configuration Display and Administration. The following screen displays.

2.Select Field 12. Master Clock Cabinet.

3.Enter the shelf number of the Master Clock shelf.

4.Select SAVE to save the information.

5.3Test System

The system should now be tested to ensure that it is functioning correctly. See Test System in the Link WTS – Link 3000 MCU: Installation manual for more information.

Part Number: 72-0059-06-E.doc

Page 23

Image 23
Contents T1 Remote Module Installation Trademark Information Part Number 72-0059-06-E.doc UL Information FCC Information Industry Canada IC Notice Table of Contents Icons Used in this Document About This DocumentContacting SpectraLink Location a Local Remote Installation Steps Overview Required Materials Provided by Customer Site PreparationChannel Service Unit CSU T1 Configuration RequirementsCheck Components Connect Intershelf Junction Panel Install T1 Remote Module at Local SiteNetwork Clocked T1 Facilities Alarm Survey Site Install System at Remote SiteInstall Shelves Install Cards Connect Power to ShelvesConnect Multiple Remote Shelves Connect Cables to T1 Remote ModuleAlarm Connect Demarc Block RJ-21 Cables to Interface Modules Configure Remote Shelf Configure Remote SystemTest System Master Clock ConfigurationSite Certification Installation Forms Shelf Number Interface Module Base Station Location FormShelf Interface Module Extension Assignments WorksheetMonday through Friday, 7 AM to 6 PM MT Site Preparation ChecklistQty Customer Acceptance FormCustomer Acceptance Form Index