2. Site Preparation
The following steps must be completed before installing the system hardware. If the steps are not already completed refer to each individual section for details.
1.At the local site, install and test Primary Shelf and Expansion Shelves. Refer to Link WTS – Link 3000 MCU: Installation
2.At the remote site:
2.1Install a two pair cable to each Base Station as designated on the building floorplans.
2.2Terminate the Base Station wiring with
2.3Terminate the Base Station wire at the appropriate
2.4Terminate the analog or digital phone extensions from the phone system at the appropriate
2.1Required Materials Provided by Customer
Rack - the shelves are designed to fit into a 19 inch mounting rack. Each shelf measures 15” high by 19” wide by 9” deep, and weighs approximately 35 pounds fully loaded. See Prepare Location for Shelves, in the Link WTS – Link 3000 MCU: Installation document.
Backboard space – as an alternative to rack mounting, the shelves can be wall mounted to ¾” plywood securely screwed to a wall.
Screws – required to mount the shelves to the wall, or to secure it in the rack. For wall mount, six