SpectraLink Corporation  | T1 Remote Module Installation  | 
  | Link WTS – Link 3000 MCU  | 
Table of Contents
1. ABOUT THIS DOCUMENT  | 8  | |
1.1  | Contacting SpectraLink  | 8  | 
1.2  | Icons Used in this Document  | 8  | 
1.3  | Remote Installation Overview  | 9  | 
1.4  | Remote Installation Steps (Overview)  | 10  | 
2.  | SITE PREPARATION  | 11  | |
  | 2.1  | Required Materials Provided by Customer  | 11  | 
  | 2.2  | T1 Configuration Requirements  | 12  | 
  | 2.3  | Check Components  | 13  | 
3.  | INSTALL T1 REMOTE MODULE AT LOCAL SITE  | 14  | |
4.  | INSTALL SYSTEM AT REMOTE SITE  | 17  | |
  | 4.1  | Survey Site  | 17  | 
  | 4.2  | Install Shelves  | 17  | 
  | 4.3  | Connect Power to Shelves  | 18  | 
  | 4.4  | Install Cards  | 18  | 
  | 4.5  | Connect Cables to T1 Remote Module  | 19  | 
  | 4.6  | Connect Multiple Remote Shelves  | 19  | 
  | 4.7  | Connect Demarc Block   | 21  | 
5.  | CONFIGURE REMOTE SYSTEM  | 22  | |
  | 5.1  | Configure Remote Shelf  | 22  | 
  | 5.2  | Master Clock Configuration  | 23  | 
  | 5.3  | Test System  | 23  | 
6.  | SITE CERTIFICATION  | 24  | |
7.  | INSTALLATION FORMS  | 25  | |
  | 7.1  | Base Station Location Form  | 26  | 
  | 7.2  | Extension Assignments Worksheet  | 27  | 
  | 7.3  | Site Preparation Checklist  | 28  | 
  | 7.4  | Customer Acceptance Form  | 29  | 
Part Number:  | Page 7  |