7.3Site Preparation Checklist
If upon arrival the SpectraLink installer determines that the
Please be sure the following items are completed.
MCU location prepared. Typically the MCU is installed in the telephone equipment room. This location must have sufficient rack or backboard space and power available.
The Base Station cables are terminated with
One (or two)
The Base Station cables are terminated at the appropriate
Analog or digital ports, one per Wireless Telephone, from the switch are terminated at the appropriate
A dedicated dial line (MB) is available with an
An
A system administrator is designated for the SpectraLink system. This person should be present for the installation. The SpectraLink installer will provide system training to the system administrator on the day following the installation.
When this checklist is completed please sign, date, and fax to:
(Install Coordination
Signature: _______________________________________ Date: _________________
If you have any questions regarding the installation procedure, please call: