SpectraLink Corporation | T1 Remote Module Installation |
| Link WTS – Link 3000 MCU |
Base station location form, 27
Cards
Installing, 15, 19
Channel Service Unit, 13
Configuration Requirements
T1, 13
CSU, 13
Customer Acceptance Form, 30
Customer Support Hotline, 8 Demarc block, 22
Diagram, Remote Installation, 9 Expansion Shelf, 14
Connect multiple, 20
Connect to T1 Module, 20
Installing, 19
Extension assignment worksheet, 28 Forms
Base station location, 27
Customer Acceptance, 30 Extension assignments, 28 Site preparation checklist, 29
GPS timing, 11
Grounding Strap, 14
Hotline, 8
Icons, 8
Interface Modules, 14
Installing, 19
Intershelf Junction Panel, 15
JPI300, 15
Index
Master Clock, 24
Network Clocked T1, 16
Configuration, 23, 24
Power, 19
Remote Installation Diagram, 9
Remote Installation, Steps, 11
Remote Shelf
Configuring, 23
Remote Site
Surveying, 18
Required Materials, 12
Shelves
Installing, 18
Site Certification, 25
Site preparation, 12
Site preparation checklist, 29
System configuration, 23
Remote shelf, 23
T1
Configuration Requirements, 13
Connect at remote site, 20
Connecting at local site, 16
Network Clocked, 16
T1 Remote Module
Connect to Expansion Shelf, 20
Installing at local site, 15
Installing at remote site, 19
Telephone lines, 22
Testing the system, 24
Part Number: | Page 30 |