T1 Remote Module Installation

 

Link WTS – Link 3000 MCU

4. Install System at Remote Site

4.1Survey Site

Check the site to be sure pre-installation work has been completed correctly. This includes:

Location chosen for the shelves is adequate.

Rack (if rack mounted) is properly secured or backboard (if wall mounted) is properly prepared.

Power is available.

Wiring to Base Station locations has been pulled and correctly terminated.

Phone lines for the Wireless Telephones are installed and properly terminated.

Telephone system administrator is available to program the existing telephone system.

4.2Install Shelves

Rack Mount

To install shelves in the rack, slide the shelves into the rack and secure them to the rack using eight screws, 1/4 inch minimum length.

Wall Mount

At this point in the installation process, there should be a backboard securely fastened to the wall and mounting screws partially inserted into the backboard. See Link WTS – Link 3000 MCU: Installation for more information.

To attach the shelves to the wall:

1. Remove all cards from the shelf. Do not mount the shelf with cards installed.

Cards contain components that may be damaged by electrostatic discharge. Before handling any of the cards, attach the grounding strap (included in the Administration Kit) to your wrist, and attach the other end of the strap to ground. Handle cards only by their edges. Do not touch connector contact areas. Do not lift cards by any of the components. Do not lay cards down on their component sides. When laying a card down, place it component side up, on top of the anti-static bag in which it was shipped.

2.Position the MCS300 so that the six mounting screws are aligned with the six keyhole openings in the back of the shelf.

3.Slide the shelf down onto the screws to lock the shelf into place. Check that all six screws are properly locked.

4.Tighten all six screws fully.

Part Number: 72-0059-06-E.doc

Page 17

Image 17
Contents T1 Remote Module Installation Trademark Information Part Number 72-0059-06-E.doc UL Information FCC Information Industry Canada IC Notice Table of Contents Icons Used in this Document About This DocumentContacting SpectraLink Location a Local Remote Installation Steps Overview Required Materials Provided by Customer Site PreparationChannel Service Unit CSU T1 Configuration RequirementsCheck Components Connect Intershelf Junction Panel Install T1 Remote Module at Local SiteNetwork Clocked T1 Facilities Alarm Survey Site Install System at Remote SiteInstall Shelves Install Cards Connect Power to ShelvesConnect Multiple Remote Shelves Connect Cables to T1 Remote ModuleAlarm Connect Demarc Block RJ-21 Cables to Interface Modules Configure Remote Shelf Configure Remote SystemTest System Master Clock ConfigurationSite Certification Installation Forms Shelf Number Interface Module Base Station Location FormShelf Interface Module Extension Assignments WorksheetMonday through Friday, 7 AM to 6 PM MT Site Preparation ChecklistQty Customer Acceptance FormCustomer Acceptance Form Index