16. Insert the end of the Long Cable (66) through the | 16 |
|
|
|
|
|
|
| |
| indicated bracket on the Top Frame (67), and |
|
|
|
|
|
|
| |
|
| Bracket | 67 | 6 |
|
|
|
| |
| down through the indicated hole in the Top |
| 15 | 66 |
| ||||
| Frame. |
|
|
|
|
| |||
|
|
|
|
|
|
| |||
| Hold a 3 1/2” Pulley (15) inside the bracket on the |
|
|
|
|
|
|
|
|
| Top Frame (67). The Long Cable (66) must be |
|
|
|
|
|
|
|
|
| between the Pulley and the top of the bracket. |
| 12 |
|
|
|
|
|
|
| Attach the Pulley to the bracket with a 3/8” x 1 |
|
|
|
|
|
|
| |
| 3/4” Bolt (12) and 3/8” Jam Nut (6). |
|
|
|
|
|
|
|
|
17. Insert the Long Cable (66) between the “I” Plates | 17 |
| 12 |
|
|
|
|
| |
| (78). |
|
|
|
|
|
| ||
|
| 10 | 3 |
|
|
|
|
| |
|
|
| 9 |
|
|
|
|
| |
| Lay the Long Cable (66) over a 3 1/2” Pulley (15) |
| 71 | 6 |
|
| 71 | 12 |
|
|
|
|
| 15 |
|
| |||
| (see the inset drawing). Attach the Pulley and a |
|
|
| 59 |
|
|
| |
| Cable Trap (59) to the Wide Swivel Bracket (71) |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
| with a 3/8” x 1 3/4” Bolt (12) and 3/8” Jam Nut (6). |
|
|
|
|
|
|
|
|
| The Cable Trap must be turned to the “10 o’clock” |
|
|
|
|
|
|
|
|
| position. |
|
|
| 6 |
|
| 66 |
|
|
|
|
|
|
|
|
|
| |
|
|
| 66 |
|
|
|
|
|
|
|
|
| 78 |
|
|
|
|
|
|
18 | . Wrap the Long Cable (66) down around a 3 1/2” | 18 |
|
|
|
|
|
|
|
| Pulley (15). Attach the Pulley and a Cable Trap |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
| (59) to the Narrow Swivel Bracket (58) on the left |
|
|
|
|
|
|
|
|
| Arm (46) with a 3/8” x 1 3/4” Bolt (12) and 3/8” |
|
|
|
|
|
|
|
|
| Jam Nut (6). The Cable Trap must be turned to |
| 66 |
| 15 | 58 |
|
| 12 |
| the “3 o’clock” position. |
|
|
|
| ||||
|
|
|
|
|
|
| |||
|
|
|
|
| 6 |
|
|
| 46 |
|
|
|
|
| 59 |
|
|
|
|
|
|
|
|
|
| 12 |
|
|
|
|
|
|
|
|
| 9 | 3 |
|
|
|
|
|
|
|
| 6 |
|
|
|
19. Attach the Adjustment “U” Bracket (75) to the | 19 |
|
|
|
|
|
|
| |
| Front Upright (42) with a 5/16” x 3” Bolt (17), |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
| 5/16” Flat Washer (8) and 5/16” Nylon Lock Nut |
|
|
|
|
|
|
|
|
| (3)Note:. This Bracket is used to adjust the |
| 3 |
|
|
|
|
|
|
| tension of the Long Cable. Thread the Nylon |
|
|
|
|
|
|
| |
|
| 8 |
|
|
|
|
|
| |
| Lock Nut onto the Bolt only two complete |
|
|
|
|
|
|
| |
| turns. |
| 42 |
|
|
|
| 12 | 66 |
|
|
|
|
|
|
|
| ||
| Wrap the Long Cable (66) around a 4 1/2” Pulley |
|
|
| 75 |
|
|
|
|
| (77). Attach the Pulley to the Adjustment “U” |
|
|
| 6 |
|
|
|
|
| Bracket (75) with a 3/8” x 1 3/4” Bolt (12) and 3/8” |
|
|
|
|
|
|
| |
|
|
|
| 17 |
|
| 77 |
| |
| Jam Nut (6). |
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
| |
|
| 9 |
|
|
|
|
|
|
|