Life Fitness manual SM50 Unpacking & Assembly Instructions

Page 18

SM50 Unpacking & Assembly Instructions

The parts shown in Hardware Figure 1 are used to assemble the SM50. They are:

A.7/16” x 6” hex head bolt (used to bolt the tricep top beam, adjustable crossover top beam, lat top beam, and connecting beam to the tops of the cells)

B.7/16” flat washer

C.7/16” cap washer (used on the head end of the 6” bolt so end cap will fit on the nut)

D.7/16” hex head nut

E.3/8” x 3” hex head bolt (used to bolt the cross beam to the cross members, the adjustable pulley tops to the top beams, and the bottom bolts on the lat bench)

F.3/8” x 2-3/4” hex head bolt (used for all other connections)

G.End caps (bolt covers)

H.3/8” flat washer

J.3/8” end cap washers (end caps snap onto them)

K.3/8” Nyloc (locknut)

18

Image 18
Contents M051-K50-B115 Materials and Tools Required for Assembly Assembly TimeParts box contents UnpackingAssembly SM50 main components seats and cables removed for claritySet the weight stack cells Configuration for 2-3/4 and 3 bolts Configuration for 6 bolts Putting on the weight stacks SM50 Unpacking & Assembly Instructions Use a pinch bar to align the seat frame holes to the cubes SM50 Unpacking & Assembly Instructions Installing the Cables Removing the pulley boltsCrossover Cable Routing Crossover cable routingLOW ROW Cable Routing Low row cable routingScrew the cable into the weight stack LAT Pulldown Cable RoutingTricep Pushdown Cable Routing Tricep pushdown cable routingHardware . Assembly Parts HardwareSM50 Unpacking & Assembly Instructions Hardware . Cable jam nut Hardware . CablesHardware . Top assemblies Hardware . Weight stack rubber bumpers Hardware . Floating pulleysParts List Pulley hardware InstalledHardware installed Floating pulley