Life Fitness manual Assembly, SM50 main components seats and cables removed for clarity

Page 4

SM50 Unpacking & Assembly Instructions

ASSEMBLY

Figure 2 shows an assembled SM50.

Figure 2. SM50 main components (seats and cables removed for clarity).

1.

1 stack cell

5.

Lat top

2.

4 stack cell

6.

Tricep top

3.

Lat bench

7.

Low row bench

4.

Connecting beam

8.

300 lb. Weight stacks (2)

9.190 lb. Weight stacks (3)

1.Place the two weight “cells” in their final resting spots. The cells will be approximately 11’4” apart as shown in Figure 3.

4

Image 4
Contents M051-K50-B115 Materials and Tools Required for Assembly Assembly TimeParts box contents UnpackingAssembly SM50 main components seats and cables removed for claritySet the weight stack cells Configuration for 2-3/4 and 3 bolts Configuration for 6 bolts Putting on the weight stacks SM50 Unpacking & Assembly Instructions Use a pinch bar to align the seat frame holes to the cubes SM50 Unpacking & Assembly Instructions Installing the Cables Removing the pulley boltsCrossover Cable Routing Crossover cable routingLOW ROW Cable Routing Low row cable routingScrew the cable into the weight stack LAT Pulldown Cable RoutingTricep Pushdown Cable Routing Tricep pushdown cable routingHardware . Assembly Parts HardwareSM50 Unpacking & Assembly Instructions Hardware . Cable jam nut Hardware . CablesHardware . Top assemblies Hardware . Weight stack rubber bumpers Hardware . Floating pulleysParts List Installed Hardware installedPulley hardware Floating pulley