Life Fitness SM50 manual Crossover Cable Routing, Crossover cable routing

Page 13

SM50 Unpacking & Assembly Instructions

CROSSOVER CABLE ROUTING

Once you’ve removed the pulleys as described previously, route the crossover cables on the 4-stack cell as shown in Figure 16. The crossover cable is routed at the factory on the 1-stack cube.

Figure 16. Crossover cable routing.

13

Image 13
Contents M051-K50-B115 Assembly Time Materials and Tools Required for AssemblyUnpacking Parts box contentsSM50 main components seats and cables removed for clarity AssemblySet the weight stack cells Configuration for 2-3/4 and 3 bolts Configuration for 6 bolts Putting on the weight stacks SM50 Unpacking & Assembly Instructions Use a pinch bar to align the seat frame holes to the cubes SM50 Unpacking & Assembly Instructions Removing the pulley bolts Installing the CablesCrossover cable routing Crossover Cable RoutingLow row cable routing LOW ROW Cable RoutingLAT Pulldown Cable Routing Screw the cable into the weight stackTricep pushdown cable routing Tricep Pushdown Cable RoutingHardware Hardware . Assembly PartsSM50 Unpacking & Assembly Instructions Hardware . Cables Hardware . Cable jam nutHardware . Top assemblies Hardware . Floating pulleys Hardware . Weight stack rubber bumpersParts List Hardware installed InstalledPulley hardware Floating pulley