SM50 Unpacking & Assembly Instructions
F.Bolt on the top plate. With the top plate on the guide rods, bolt on the top plate to the top of the cells as shown in Figure 11 using a 9/16” socket and combination wrench and the 3” bolts (with cap washers) that were previously inserted.
Figure 11. Bolt on the top plate.
6.Bolt the floating pulley into the 190 lb cable crossover weight stack (NOT intended for the tricep pushdown weight stack- the one with the tricep back rest mounted to the frame as shown in Figure 10) using a 7/8” combination wrench. You will need to remove the pulley from the housing to thread the plug into the weight stack bayonet. Make sure the 9/16” jam nut is threaded 1-5/8” away from the pulley as shown in Figure 12. Leave the pulleys out since you will need to have them out when the cable is routed.
Figure 12. Bolt the floating pulley into the 190 lb weight stack (on cable crossover).
9