Life Fitness SM50 manual Unpacking, Parts box contents

Page 3

SM50 Unpacking & Assembly Instructions

UNPACKING

Follow the steps below when unpacking the components of the SM50.

1.Cut off the shipping wrapper.

2.Remove the parts box and shipping boards.

3.Remove the items in the parts box. These items are shown in Figure 1.

A.Remove the bolts bag.

B.Remove the parts shown below. Parts that are used to build the SM50 are described in the section HARDWARE at the end of these instructions.

Figure 1. Parts box contents.

3

Image 3
Contents M051-K50-B115 Assembly Time Materials and Tools Required for AssemblyUnpacking Parts box contentsSM50 main components seats and cables removed for clarity AssemblySet the weight stack cells Configuration for 2-3/4 and 3 bolts Configuration for 6 bolts Putting on the weight stacks SM50 Unpacking & Assembly Instructions Use a pinch bar to align the seat frame holes to the cubes SM50 Unpacking & Assembly Instructions Removing the pulley bolts Installing the CablesCrossover cable routing Crossover Cable RoutingLow row cable routing LOW ROW Cable RoutingLAT Pulldown Cable Routing Screw the cable into the weight stackTricep pushdown cable routing Tricep Pushdown Cable RoutingHardware Hardware . Assembly PartsSM50 Unpacking & Assembly Instructions Hardware . Cables Hardware . Cable jam nutHardware . Top assemblies Hardware . Floating pulleys Hardware . Weight stack rubber bumpersParts List Floating pulley InstalledHardware installed Pulley hardware