Life Fitness
SM50
manual
LOW ROW Cable Routing, Low row cable routing
Install
Parts list
Configuration for 6 bolts
Assembly Time
Weight
Page 14
SM50 Unpacking & Assembly Instructions
LOW ROW CABLE ROUTING
Route the low row cable as shown in Figure 17.
Figure 17. Low row cable routing.
14
Page 13
Page 15
Image 14
Page 13
Page 15
Contents
M051-K50-B115
Materials and Tools Required for Assembly
Assembly Time
Parts box contents
Unpacking
Assembly
SM50 main components seats and cables removed for clarity
Set the weight stack cells
Configuration for 2-3/4 and 3 bolts
Configuration for 6 bolts
Putting on the weight stacks
SM50 Unpacking & Assembly Instructions
Use a pinch bar to align the seat frame holes to the cubes
SM50 Unpacking & Assembly Instructions
Installing the Cables
Removing the pulley bolts
Crossover Cable Routing
Crossover cable routing
LOW ROW Cable Routing
Low row cable routing
Screw the cable into the weight stack
LAT Pulldown Cable Routing
Tricep Pushdown Cable Routing
Tricep pushdown cable routing
Hardware . Assembly Parts
Hardware
SM50 Unpacking & Assembly Instructions
Hardware . Cable jam nut
Hardware . Cables
Hardware . Top assemblies
Hardware . Weight stack rubber bumpers
Hardware . Floating pulleys
Parts List
Pulley hardware
Installed
Hardware installed
Floating pulley
Related pages
Troubleshooting for Audiovox VOD128
Interpreting Indicator Lights for Avaya 4606
Sample System Diagram for Channel Plus SVC-10
How to operate Rtsp for Siemens CFMC1315-LP
Preparing for Installation c o n t i n u e d for Conair 50
BR67 Standard Parts List for Stanley Black & Decker BR67
Country Code List for Zenith DVB352
Refer to the Other Settings field to define the following for Motorola WS5100
Where can I find genuine Miele parts for my oven?
(#)
Top
Page
Image
Contents