ASSEMBLE THE BASE

2. ASSEMBLE THE BASE

A.BASE ASSEMBLY

1.Collect the crates containing the Base Assembly parts. Table 2.1 (on page 11) shows the quantity of each crate required. The crates contain the following parts:

Crate

Items

Sub-Assembly #

Part #

 

 

 

 

 

Right End Panel Sub-Assembly

 

GG-2105

2

Left End Panel Sub-Assembly

90338

GG-2106

 

Burner Support Channel Clips (2)

 

GG-2070

 

Front Panel Sub-Assembly

 

GG-2080

 

Back Panel Sub-Assembly

 

GG-2081

2AA

Burner Support Channel

90340

GG-2066

 

Front Panel Support Bracket

 

GG-2069

 

Section Assembly Kit

 

GG-1030

 

Front Panel Sub-Assembly

 

GG-2080-1

 

Back Panel Sub-Assembly

 

GG-2081-1

2BB

Burner Support Channel

90341

GG-2066-1

Angle Tie Brace

GG-2065

 

 

 

Front Panel Support Bracket

 

GG-2069

 

Section Assembly Kit

 

GG-1030

 

Front Panel Sub-Assembly

 

GG-2080-2

 

Back Panel Sub-Assembly

 

GG-2081-2

2CC

Burner Support Channel

90342

GG-2066-2

Angle Tie Brace

GG-2065

 

 

 

Front Panel Support Bracket

 

GG-2069

 

Section Assembly Kit

 

GG-1030-1

 

Front Panel Sub-Assembly

 

GG-2080-3

 

Back Panel Sub-Assembly

 

GG-2081-3

2DD

Burner Support Channel

90343

GG-2066-3

Angle Tie Brace

GG-2065

 

 

 

Front Panel Support Bracket

 

GG-2069

 

Section Assembly Kit

 

GG-1030-2

 

Front Panel Sub-Assembly

 

GG-2080-4

 

Back Panel Sub-Assembly

 

GG-2081-4

2EE

Burner Support Channel

90344

GG-2066-4

Angle Tie Brace

GG-2065

 

 

 

Front Panel Support Bracket

 

GG-2069

 

Section Assembly Kit

 

GG-1030-3

2.Open crate number 2. Remove the End Panels and mount a Support Channel Clip toward the rear on each panel as shown in Figure 2.2 using 1/4"-20 x 1/2" (13 mm) long round head machine screws and 1/4" lock washers provided.

Figure 2.2: Steel Base Assembly

Figure 2.1: Boiler Base Assembly

9

Page 11
Image 11
PB Heat 211A manual Assemble the Base, Base Assembly, Crate Items