Manuals
/
PB Heat
/
Kitchen Appliance
/
Range
PB Heat
211A
manual
Typical Wiring Standard Controls 120-Volt Gas Valves
Models:
211A
1
41
59
59
Download
59 pages
21.23 Kb
38
39
40
41
42
43
44
45
<
>
Troubleshooting
Install
Repair Parts Series 211A
Chart continues on
Wire the Boiler
Dimension
Maintenance
Base Assembly
Boiler Setting
Apply Cleanout Cover Plates
Page 41
Image 41
WIRE THE BOILER
Figure 9.3: Typical Wiring – Standard Controls –
120-Volt
Gas Valves
39
Page 40
Page 42
Page 41
Image 41
Page 40
Page 42
Contents
Series 211A
Table of Contents
Follow the Piping Guidelines
Using this Manual
Controls
Special Attention Boxes
Accessibility Clearances
Preinstallation
Combustible Construction Clearances
AIR for Combustion and Ventilation
21 ft
Required Volume other =
Required Volume fan = 15 ft
Input for all appliances in the space. See
Btu/hr 22 cm 2 per 2000 W of total rated
Where
Chimney or Vent
Mechanical Combustion Air Supply
Combustion Air Ducts
Combined vent breeching
Exterior Vents
Vent Sizing
Water Quality and MAKE-UP
Boiler Setting
Installation Survey
Boiler Foundation Layout
Crate Items
Base Assembly
Assemble the Base
For 211A-04 through 211A-08 Only
Install the Pilot Burners
Model Overall Length
Base Front and Back Panel Crates
Typical Gas Manifold and Pilot Line Assembly
Burners
Total Natural Gas Only Propane Gas Only Model Number
Pilots
Placing the Sections
Place the Boiler Sections
Preparation
Assembling Sections on Base
Align Sections Vertically
Hydrostatic Test the Boiler
Do not tighten yet
Install the Flue Collector
Boiler Position
Return Piping
Pipe the Boiler
Supply Piping
Pipe the Boiler
Boiler Header End Risers
Multiple Boiler Installations
Equalizers
Model Size
Piping Multiple Boilers, Typical, Gravity Return Systems
Apply Cleanout Cover Plates
Install the Jacket & Draft Hood
Prepare the Parts
Apply Jacket END Assemblies
Apply Plates and Labels
Apply Lower END Panels
Apply Jacket TOP Panels
Top Panel GG-6024
Carton Contents Sub-Assembly Part Number Quantity
Jacket Assembly Sequence Carton Numbers and Locations
13C
Install Vent and Bleed Piping
Install GAS Train
Connect GAS Piping
Connect Pilot GAS Tubing
Test GAS Supply Piping
Install GAS Supply Piping
Specific Gravity Multiply Capacity by
Pipe Length 4 Pipe 2 Pipe
Install Safety Valves Install LOW Water CUT-OFFS
Install Controls and Trim
Install Blowdown Valves
Install Pressure Controls
Pressure Control Piping Fittings Included with Boiler
Standard Float Type COntrol, Model 67PE2
Optional Float Type Pump Control/Low Water Cut-Off, Model
Application of 51 Feeders
Connect Supply Wiring
Wire the Boiler
Install Control Wiring
Prepare Remaining Controls
Typical Wiring Standard Controls Low Voltage Gas Valves
Typical Wiring Standard Controls 120-Volt Gas Valves
Starting the Boiler
Meter reading. Rate, Btu/Hr = F x H x
Clean the Boiler
Check Boiler Controls
Pilot Flame Failure
Lighting Instructions Typical
To Light the Boiler To Shut Down the Boiler
Operation & Maintenance
Pilot and Burner Flames
Placing Boiler in Operation
Annual Maintenance
Monthly Maintenance
Weekly Maintenance
Daily Maintenance
Problem Possible Cause Suggested Remedy
Troubleshooting Service Tips
Correct Piping
Boiler Rating Information
Boiler Ratings & Dimensions
Boiler Ratings & Dimensions
Series 211A Steam Boiler Dimensions
Chart continues on
Series 211A Steam Boiler Dimensions
Description Part Selection Information Stock Code
Repair Parts Series 211A
Base Front Panel Cover Plate 26 660 mm Wide Base Panel
Boiler Assembly
Base Assembly
Page
Series 211A
Top
Page
Image
Contents