ASSEMBLE THE BASE
3.Attach the Front Panel and Back Panel (Figure 2.2) to the Left Hand End Panel using
4.For 211A-04 through 211A-08 Only:
a.Complete the base assembly by attaching the Right End Panel and setting the Burner Support Channel on the clips.
Figure 2.3: Support Bracket Installation
Figure 2.4: Angle Tie Brace Installation
5.For 211A-09 through 211A-46 Only:
a.Attach a Front Panel Support Bracket to each Front Panel as shown in Figure 2.3.
6.Attach an Angle Tie Brace at each panel joint to secure the front and back panels as shown in Figure 2.4 using
7.Bolt remaining Front and Back Panels together using
8.Complete the base assembly by attaching the Right Hand End Panel using
9.Set the Burner Support Channels in place as shown in Figure 2.1.
B.INSTALL THE PILOT BURNERS
1.Check the location of the Burner Support Channels in the Base Assembly. The dimensions should be:
a.Height above boiler foundation:
b. Distance from back of Base: |
2.Remove the Gas Manifold and Pilot Line Assembly from Box Number 7.
3.Place Manifold on front of Base. Bolt the hangers using
10