Manuals
/
PB Heat
/
Kitchen Appliance
/
Range
PB Heat
211A
manual
Piping Multiple Boilers, Typical, Gravity Return Systems
Models:
211A
1
24
59
59
Download
59 pages
21.23 Kb
21
22
23
24
25
26
27
28
<
>
Troubleshooting
Install
Repair Parts Series 211A
Chart continues on
Wire the Boiler
Dimension
Maintenance
Base Assembly
Boiler Setting
Apply Cleanout Cover Plates
Page 24
Image 24
PIPE THE BOILER
Figure 5.5: Piping Multiple Boilers, Typical, Gravity Return Systems
Figure 5.6: Piping Multiple Boilers, Typical, Pumped Return Systems
22
Page 23
Page 25
Page 24
Image 24
Page 23
Page 25
Contents
Series 211A
Table of Contents
Using this Manual
Follow the Piping Guidelines
Controls
Special Attention Boxes
Preinstallation
Accessibility Clearances
Combustible Construction Clearances
AIR for Combustion and Ventilation
Required Volume other =
Required Volume fan = 15 ft
21 ft
Btu/hr 22 cm 2 per 2000 W of total rated
Input for all appliances in the space. See
Chimney or Vent
Where
Mechanical Combustion Air Supply
Combustion Air Ducts
Exterior Vents
Vent Sizing
Combined vent breeching
Boiler Setting
Installation Survey
Water Quality and MAKE-UP
Boiler Foundation Layout
Base Assembly
Assemble the Base
Crate Items
Install the Pilot Burners
For 211A-04 through 211A-08 Only
Base Front and Back Panel Crates
Model Overall Length
Typical Gas Manifold and Pilot Line Assembly
Total Natural Gas Only Propane Gas Only Model Number
Pilots
Burners
Place the Boiler Sections
Preparation
Placing the Sections
Assembling Sections on Base
Hydrostatic Test the Boiler
Align Sections Vertically
Install the Flue Collector
Do not tighten yet
Boiler Position
Pipe the Boiler
Supply Piping
Return Piping
Pipe the Boiler
Multiple Boiler Installations
Boiler Header End Risers
Equalizers
Model Size
Piping Multiple Boilers, Typical, Gravity Return Systems
Install the Jacket & Draft Hood
Apply Cleanout Cover Plates
Prepare the Parts
Apply Jacket END Assemblies
Apply Lower END Panels
Apply Jacket TOP Panels
Apply Plates and Labels
Top Panel GG-6024
Carton Contents Sub-Assembly Part Number Quantity
Jacket Assembly Sequence Carton Numbers and Locations
13C
Install GAS Train
Install Vent and Bleed Piping
Connect GAS Piping
Connect Pilot GAS Tubing
Install GAS Supply Piping
Test GAS Supply Piping
Pipe Length 4 Pipe 2 Pipe
Specific Gravity Multiply Capacity by
Install Controls and Trim
Install Safety Valves Install LOW Water CUT-OFFS
Install Blowdown Valves
Install Pressure Controls
Pressure Control Piping Fittings Included with Boiler
Standard Float Type COntrol, Model 67PE2
Optional Float Type Pump Control/Low Water Cut-Off, Model
Application of 51 Feeders
Wire the Boiler
Connect Supply Wiring
Install Control Wiring
Prepare Remaining Controls
Typical Wiring Standard Controls Low Voltage Gas Valves
Typical Wiring Standard Controls 120-Volt Gas Valves
Starting the Boiler
Clean the Boiler
Check Boiler Controls
Meter reading. Rate, Btu/Hr = F x H x
Lighting Instructions Typical
To Light the Boiler To Shut Down the Boiler
Pilot Flame Failure
Operation & Maintenance
Placing Boiler in Operation
Pilot and Burner Flames
Monthly Maintenance
Annual Maintenance
Weekly Maintenance
Daily Maintenance
Troubleshooting Service Tips
Problem Possible Cause Suggested Remedy
Correct Piping
Boiler Ratings & Dimensions
Boiler Rating Information
Boiler Ratings & Dimensions
Chart continues on
Series 211A Steam Boiler Dimensions
Series 211A Steam Boiler Dimensions
Repair Parts Series 211A
Description Part Selection Information Stock Code
Base Front Panel Cover Plate 26 660 mm Wide Base Panel
Boiler Assembly
Base Assembly
Page
Series 211A
Top
Page
Image
Contents