Spalding M88604C1 manual Insert bushings 19 into areas shown

Page 8

6.

 

Insert bushings (19) into areas shown.

 

 

13

19

19

19

19 19

19

19

19

19

17

19

19

19

19

19

1

19

19

19

19

18

19

19

19

ID# M88604C1

08/06

8

Image 8
Contents High End Residential In-Ground Basketball System Required Tools and Materials Parts List Hardware Identifier Bolts & Screws Install nuts 25 onto the ground tube bolts as shown Side View Build drainage hillPlaying Surface Insert bushings 19 into areas shown Playing Surface Mounting plate 2 as shownCompleted Assembly 08/06 ID# M88604C1 Attach elevator adjustment 12 to Lower yokeAttach elevator adjustment 12 to pole bracket Using TWO people to hold the board Attach backboard 13 to upper and lowerYokes 18 First attach board 13 to upper yokeEnd of the rod as shown Figure a Apply height indicator labels 32 & 31 to height indicators Attach height indicatorsInstall net 4 to rim as shown Screws 29 into place with a phillips-head screwdriver08/06 ID# M88604C1 After pole has been secured to the anchor plate 2 loosen nut Feet 05 m Limited Lifetime Warranty